Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Defining space types

CI-v4.1 EQc9:Acoustic Performance
posted by  Rachel Bundy  on 

Would you include a restroom adjacency as an occupied space? If so, how would you define it as private?

0

Fans as an End Use

NC-v4 EAc3:Advanced energy metering
posted by  Pooja Sannamani  on 

Hi, we'd like to make sure we are meeting the intent of the credit correctly when it comes to fans.  

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jan 8, 2021, 10:16 pm

Cubicle Hardware Included in Low-Emitting Materials Credit

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Nicole Jenkins  on 

While the language reference cubicle/curtain/partition walls, has anyone included cubicle hardware in the Low Emitting Walls/ Ceiling credit?

1
Fri Feb 5, 2021, 6:16 pm

Experience with Pilot Credit MRpc87- Verified Construction & Demolition Rates

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Sam Mitchell  on 

The overall intent of the pilot is definitely impactful in helping to shift the market to more strict verification processes; however, there could me more alternative compliance path

0
1
Fri Jan 8, 2021, 6:25 pm

PBT Source Reduction Calculator sill required for all LED lighting?

Healthcare-v4 MRp3:PBT source reduction - mercury
posted by  Rebecca Mann  on 

Our healthcare project is a new build, and will specify all LED light fixtures. No fixtures contain mercury.

1
Fri Apr 29, 2022, 3:29 pm

Need more info on v4.1 Integrative Process credit

NC-v4.1 IPc1:Integrative Process
posted by  Victoria Rios Esteve  on 

Hi everyone! We are working on the certificacion of a major renovation building. We are willing to get this IP credit but have some doubts.

1
Fri Jan 8, 2021, 6:21 pm
1
Tue Jan 12, 2021, 4:02 pm

Experience Feedback for Biophilic Design

Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environment
posted by  Robyn Vettraino  on 

In our experience with this pilot, it was really the intent that stood out as the driving force behind the design decisions and there was less of a need to simply check boxes of pre-set requirement

0

Safety First: Re-Enter Your Workspace COVID-19

EBOM-v4 INc1:Innovation
posted by  ERM Korea  on 

Has anyone achieve the credit Safety First: Re-Enter Your Workspace

0