Outdoor Water Use Reduction - Establishment Period
NC-v4 WEc1:Outdoor water use reductionposted by David Valade on
For Outdoor Water Use Reduction - when targeting 'Option 2: Reduce Irrigation', does LEED v4 or 4.1 allow for an establishment period with potable water or can potable water not be used a
Floor classification
NC-v4.1 EAp2:Minimum Energy Performanceposted by Davide Liviero on
Hello everyone,
Requerimiento horario
Retail-NC-v4 SSc6:Light pollution reductionposted by Jorge Adalberto Bernal Segovia on
Existe algún requerimiento horario para el apagado y encendido de luces exteriores?
Play area excluded from calculations?
NC-v4.1 SSc4:Rainwater Managementposted by Maddie Spinski on
We are building an early childhood education center next to the existing elementary school.
AEDG Calculator Needed When Base Building Systems Weren't Modified or Contributing to Savings?
CI-v4 EAc2:Optimize energy performanceposted by Gera Feigon on
I have a small office fit-out project that is pursuing Option 2 (prescriptive) for Optimize Energy Performance.
Tolerance within the achievement of criterias due to different affectations
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Audrey LEDESERT on
Hi,
I'm working on a project with administration affectation and some commercial surfaces on the groundfloor (surface < 40% of the total project surfaces).
Definition of Short term and Long Term bike storage
NC-v4 LTc6:Bicycle facilitiesposted by Martin Stowell on
How does LEED define short term and long term bike storage? What are some examples of each? This is for a NCV4 Core and Shell project. Thanks.
Standard supply pressure is different than the LEED baseline supply pressure
NC-v4.1 WEp2:Indoor Water Use Reductionposted by Greenlab on
Dear all
About this statement:
Tenants using energy supplier meters
CS-v4 EAc3:Advanced energy meteringposted by Ricardo Sá on
Dear All,
We are currently certifying a large office building using LEED v4 BD+C Core & Shell.
Project without landscape area
NC-v4 WEc1:Outdoor water use reductionposted by Azfar Mohamed on
Hello everyone,
Currently, we have a manufacturing facility registered for LEED NC BD+C V4.
This project does not have any landscape area at the moment.