Forum quick links
No more than 25% of the building’s cool-wall area facing away from the equator
Pilot-Credits SSpc154:Heat Island Mitigation with Cool Wallsposted by Aleksandra Prawda on
Hi all,
Baseline Envelope
NC-v4.1 EAp2:Minimum Energy Performanceposted by Mike Mentzos on
I would like to confirm that in the case of Major Renovation the baseline is the same as New Construction
LEED / WELL Crosswalk
Pilot-Credits EQpc105:Lead Risk Reductionposted by Dave Hubka on
Our project is pursuing LEED/WELL concurrently, as such we used the LEED/WELL crosswalk guidance to demonstrate compliance with this pilot credit.
Letter from owner committing to sharing water usage data
NC-v4.1 WEp2:Indoor Water Use Reductionposted by Mary Holland on
What language is LEED looking for in this letter?
Requirements for visitors counting
Pilot-Credits LTpc134:Advanced Transportation Monitoring Systemsposted by Adriana Hansen on
Hi everyone,
Regarding visitors counting, is it necessary to count visitors who only stay in lobbies and outside areas, but does not entry the building?
Does it have to be EXISTING infrastructure?
ND-Plan-v4 SLLp1:Smart locationposted by Jeanne Davidson on
For this pre-requisite, we are developing a materplan where the buildings will be compliant with Option 4 once they are built. But they are not there yet and we are in the middle of a desert.
Total annual energy consumption in complex railway station in India
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
The railway station has one entry building which is connecting by foot over bridge with platforms.
Recommened software for doing the Interior and Daylighting analyses.
NC-v4 EQc7:Daylightposted by Jorng-ren Chern on
We’re in search for a suitable software to do the Interior and daylighting analyses for LEED V4.
STC requirement for a Retail area next to a hallway in a medical building
NC-v4 EQc9:Acoustic performanceposted by Todd Bundren on
We are working on a new medical buidling (cancer center) and there is a gift shop off a large corridor close to the main entry.
Help needed with ARC platform
EBOM-v4 MPR1:Must be in a permanent location on existing landposted by Antonio de Sousa Filho on
Hi everyone,