Forum quick links
Short and Long Term Together?
NC-v4 LTc6:Bicycle facilitiesposted by Summer Minchew on
Can short and long term spaces be located together as long as all other requirements are met?
Bipolar Ionization devices; documenting reduced outside air quantities
Schools-NC-v4 EQp1:Minimum indoor air quality performanceposted by on
I have a new school project which currently has ionization devices throughout the HVAC RTUs. These ionization devices reduce the required outside air.
IES thermal block and baseline model with system 6
NC-v4 EAc2:Optimize energy performanceposted by Ying Lindsey on
Dear all,
I need your professional opinion about a project that I am currently working on.
Supervisor can hire Cxa?
NC-v4 EAp1:Fundamental commissioning and verificationposted by Vanessa Montezuma Ramos on
We are participating in a Design-Build project of more than 20,000 ft2. Can the supervisor of the general contractor hire the Commissioning Agent?
Partial Compliance Requirement for Insulation Category
NC-v4.1 EQc2:Low-Emitting Materialsposted by Marcia Weekes on
For the insulation category, the credit language indicates that "At least 75% of all insulation, meets the VOC emissions evaluation." However, there is no further information to indic
Process HVAC modeling approach
NC-v4 EAc2:Optimize energy performanceposted by Pooja Sannamani on
Hi, we are consisering options for our high process load building in meeting the minimum requirements of the energy credit.
South-East Asia Alternative Compliance Path for ASHRAE 90.1-2010
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by dianti avo on
Hello,
Is there any Alternative Compliance Path for ASHRAE 90.1-2010 (mandatory provision) for South-East Asia region?
Thanks!
Approach to LCA
NC-v4 MRc1:Building life-cycle impact reductionposted by Barbora Cicvárková on
Hi to all,
we would like to discuss a question about determining baseline and proposed building to meet LCA credit's requirements and meet the whole credits intent.
Organizations that provide offsite conservation
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Varun Chandra on
Hello, we have a project that is looking to acheieve SSc5 by signing a contract with a thrid-party conservationist. We have numbers from TNC but need required to collect 2 more quotes.
WaterSense & Future Baseline
EBOM-v4 WEp1:Indoor water use reductionposted by Waleed AlGhamdi on
I have a project in a peculiar situation that is not addressed outright by the guidelines language and I can use some help in interpreting the rules.