Forum quick links
Modelling Chilled water pump Power for the Baseline
CS-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi LEED experts,
Number of Lux Measurements in a High Rise Office Tower
CS-v4 EQc4:Daylightposted by Christine Recke on
In a Core and Shell project Office Tower that is over 50 stories, the rule is still measure all regularly occupied spaces in the building?
No exterior lighting
EBOM-v4 SSc4:Light pollution reductionposted by ERM Korea on
Can it achieve a point by not having any of exterior lights?
The project building does have small landscape and and rooftop garden.
Change Certification level after Preliminary Design & Construction review
CS-v4 MPR1:Must be in a permanent location on existing landposted by Ronnel Flores on
Is it allowable that for Preliminary Design & Construction (D&C) submission, the project attempt for example, Silver rating.
External Lighting in car park with uncommon typology
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear All,
Regarding the mandatory requirements of ASHRAE90.1 for external lighting power.
VOC Limit Table
Schools-NC-v4.1 EQc2:Low-Emitting Materialsposted by Katie Felver on
Where is it possible to find the current reference for the VOC limits by category?
Unisex Toilet
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by sebastian castañeda on
We are working on LEED NC 2009 for a new 9 stories building. There is one unisex toilet at each office level. How I determine the number of people will use those toilets?
LED strip
NC-v4 SSc6:Light pollution reductionposted by Ilse Dijkstra-Nugteren on
I have a question about SSc6 and the BUG rating method. We would like to use the BUG rating method for LED strips/lines which are fixed on the facade of the project.
Option 2 - Reduction of Total Waste Material for major renovation project
NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Adam Yarnell on
Hi,
No envelope data
CI-v4 EAp2:Minimum energy performanceposted by Omar Elrawy on
I'm modeling a fit out space in which the data for the base building envelope (U values and SHGC) are not available, need to know if I can use the baseline envelope data in my proposed model?