Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Fresh air handling unit filters

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Karim Farah  on 

If a project has filters of MERV 7, what is the procedure done to earn minimum indoor air quality prerequisite? Given that LEED requires MERV 11 or more.

1
Tue Apr 15, 2025, 9:21 am

Commercial Multifamily BPF (when registered under NC)

Pilot-Credits EApc111:Alternative Performance Rating Method
posted by  Michelle Christopher  on 

Is the multifamly BPF listed for this ACP for all multifamily projects or only those registered under Multifamily midrise/multifamily rating systems?

0

INc - Bird Collision Deterrence

NC-v4.1 INc1:Innovation
posted by  Cecillia Freeman  on 

Does anyone have experience documenting the Bird Collision Deterrence innovation credit when using a campus approach?  If this credit is eligible for that approach, I'm wondering if

0

Regarding ASHRAE 90.1 2013 Fan Power Calculator_Excel Sheet

NC-v4 EAp2:Minimum energy performance
posted by  Anurag Ghosh  on 

Hello Everyone,

 

Can anyone share me the ASHRAE 90.1 2013 Fan Power Calculator excel sheet for baseline model. I am unable to find it anywhere.

 

3
Assistant Sustainability Manager
L&T Construction
LEEDuser Basic Member
2 thumbs up
Fri Dec 13, 2024, 3:52 pm

Sourcing of Raw Materials location requirements

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Jason Grant  on 

On May 7, 2014, Christine asked a question about how to meet Option 1 requirements related to reporting of "raw material supplier extraction locations" but it doesn't seem to me that it was ever an

8
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Thu Dec 12, 2024, 9:52 am

LEED v4 BD+C, EAc1 Enhanced Cx, Option 2. Envelope Cx: Can General Contractor contract for the BECx testing?

NC-v4 EAc1:Enhanced commissioning
posted by  Theresa Lehman  on 

Has anyone come across a scenario where the general contractor is required to contract for the functional testing of the building envelope commissioning, where the hired BECx simply "observes" the

1
Tue Dec 10, 2024, 3:57 pm

Number of spaces

NC-v4.1 LTc8:Electric Vehicles
posted by  Norman Sutton  on 

I have a site with 124 parking spaces.  For Option 1 the math points to needing 6.2 spaces (.05 x 124).  To earn the credit, will chagring stations for 6 spaces be enough, or will 7

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Tue Dec 10, 2024, 2:45 pm

Taking account for thermal brigdingt of construction joints/egde

NC-v4 EAp2:Minimum energy performance
posted by  Sonja Kildishev  on 

I wonder if/how thermal bridging of joints/egde between constructions should be included in the U-value of the construction?

3
Mon Dec 9, 2024, 6:53 pm