Fresh air handling unit filters
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Karim Farah on
If a project has filters of MERV 7, what is the procedure done to earn minimum indoor air quality prerequisite? Given that LEED requires MERV 11 or more.
Commercial Multifamily BPF (when registered under NC)
Pilot-Credits EApc111:Alternative Performance Rating Methodposted by Michelle Christopher on
Is the multifamly BPF listed for this ACP for all multifamily projects or only those registered under Multifamily midrise/multifamily rating systems?
INc - Bird Collision Deterrence
NC-v4.1 INc1:Innovationposted by Cecillia Freeman on
Does anyone have experience documenting the Bird Collision Deterrence innovation credit when using a campus approach? If this credit is eligible for that approach, I'm wondering if
Regarding ASHRAE 90.1 2013 Fan Power Calculator_Excel Sheet
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello Everyone,
Can anyone share me the ASHRAE 90.1 2013 Fan Power Calculator excel sheet for baseline model. I am unable to find it anywhere.
Sourcing of Raw Materials location requirements
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jason Grant on
On May 7, 2014, Christine asked a question about how to meet Option 1 requirements related to reporting of "raw material supplier extraction locations" but it doesn't seem to me that it was ever an
Energy Performance on Air Structured Dome
NC-v4.1 EAp2:Minimum Energy Performanceposted by Thomas Jangaard on
Hello,
Guidance on Green Wall Irrigation Requirements
Data-Centers-NC-v4 WEc1:Outdoor water use reductionposted by Venkatkrishnan Ashok on
Hello,
LEED v4 BD+C, EAc1 Enhanced Cx, Option 2. Envelope Cx: Can General Contractor contract for the BECx testing?
NC-v4 EAc1:Enhanced commissioningposted by Theresa Lehman on
Has anyone come across a scenario where the general contractor is required to contract for the functional testing of the building envelope commissioning, where the hired BECx simply "observes" the
Number of spaces
NC-v4.1 LTc8:Electric Vehiclesposted by Norman Sutton on
I have a site with 124 parking spaces. For Option 1 the math points to needing 6.2 spaces (.05 x 124). To earn the credit, will chagring stations for 6 spaces be enough, or will 7
Taking account for thermal brigdingt of construction joints/egde
NC-v4 EAp2:Minimum energy performanceposted by Sonja Kildishev on
I wonder if/how thermal bridging of joints/egde between constructions should be included in the U-value of the construction?