Forum quick links
Can shared vehicles that do not have stops be considered public transport?
NC-v4 LTc5:Access to quality transitposted by Kavita Suresh on
Is there any guidance for passing shared vehicles (e.g. not stopping at the site) to be considered public transport?
Benchmark against Historical Data
Warehouses-EBOM-v4 EAp2:Minimum energy performanceposted by Omar Elrawy on
I have a case of a manufacturing facility, in which my only option is to compare against historical data.
BUG Method
NC-v4 SSc6:Light pollution reductionposted by Heather Holdridge on
I'm using the BUG method for this first time to document this credit. To confirm, is it correct that there is no limit on number of fixtures, so long as the BUG rating complies? I want
Bulk Water Deliveries
NC-v4.1 WEc2:Indoor Water Use Reductionposted by Carrie Cardona on
Hello -- I have a question regarding bulk water deliveries and how they might affect water and/or energy use credits.
Unable to install monitor
NC-v4 EQp1:Minimum indoor air quality performanceposted by Omar Elrawy on
Dear all,
Commingled waste and numbers of waste streams
NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Bryna Dunn on
Is there a documented environmental benefit to all the extra red tape we have to wade through "for LEED points" for projects where collecting in a commingled bin is actually the most likely way to
Minimal landscape area
NC-v4 WEp1:Outdoor water use reductionposted by Emily Purcell on
Hi,
I'm aware of the guidance for this prereq/credit that allows projects with no landscaping to achieve the prereq and two points under Option 1 of the credit.
PV for EAc1 Energy Prequisites C+S/NC LEED v3 2009
NC-2009 EAp2:Minimum Energy Performanceposted by Susan Di Giulio on
Using PV for EAp2 (C+S/NC): Can we demonstrate compliance with the energy prerequisites using the project's renewable energy, or does it need to show 4 EAc1 points using energy efficiency alone?
PV for EAc1 Energy Prequisites C+S/NC LEED v3 2009
NC-2009 EAp2:Minimum Energy Performanceposted by Susan Di Giulio on
Using PV for EAp2 (C+S/NC): Can we demonstrate compliance with the energy prerequisites using the project's renewable energy, or does it need to show 4 EAc1 points using energy efficiency alone?