Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Can shared vehicles that do not have stops be considered public transport?

NC-v4 LTc5:Access to quality transit
posted by  Kavita Suresh  on 

Is there any guidance for passing shared vehicles (e.g. not stopping at the site) to be considered public transport?

0

Benchmark against Historical Data

Warehouses-EBOM-v4 EAp2:Minimum energy performance
posted by  Omar Elrawy  on 

I have a case of a manufacturing facility,  in which my only option is to compare against historical data.

0

BUG Method

NC-v4 SSc6:Light pollution reduction
posted by  Heather Holdridge  on 

I'm using the BUG method for this first time to document this credit.  To confirm, is it correct that there is no limit on number of fixtures, so long as the BUG rating complies?  I want

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Fri Apr 10, 2020, 4:14 pm

Bulk Water Deliveries

NC-v4.1 WEc2:Indoor Water Use Reduction
posted by  Carrie Cardona  on 

Hello -- I have a question regarding bulk water deliveries and how they might affect water and/or energy use credits.

1
Fri Apr 17, 2020, 6:05 am
1
Mon May 4, 2020, 10:16 pm

Commingled waste and numbers of waste streams

NC-v4.1 MRc5:Construction and Demolition Waste Management
posted by  Bryna Dunn  on 

Is there a documented environmental benefit to all the extra red tape we have to wade through "for LEED points" for projects where collecting in a commingled bin is actually the most likely way to

1
Sun May 31, 2020, 6:00 pm

Minimal landscape area

NC-v4 WEp1:Outdoor water use reduction
posted by  Emily Purcell  on 

Hi,

I'm aware of the guidance for this prereq/credit that allows projects with no landscaping to achieve the prereq and two points under Option 1 of the credit.

 

1
Wed Aug 21, 2024, 1:18 pm

PV for EAc1 Energy Prequisites C+S/NC LEED v3 2009

NC-2009 EAp2:Minimum Energy Performance
posted by  Susan Di Giulio  on 

Using PV for EAp2 (C+S/NC): Can we demonstrate compliance with the energy prerequisites using the project's renewable energy, or does it need to show 4 EAc1 points using energy efficiency alone?

1
Wed Apr 8, 2020, 11:46 pm

PV for EAc1 Energy Prequisites C+S/NC LEED v3 2009

NC-2009 EAp2:Minimum Energy Performance
posted by  Susan Di Giulio  on 

Using PV for EAp2 (C+S/NC): Can we demonstrate compliance with the energy prerequisites using the project's renewable energy, or does it need to show 4 EAc1 points using energy efficiency alone?

1
Fri Apr 10, 2020, 8:29 pm