Forum quick links
Points in Addition to Renewable Energy Production?
NC-v4 EAc2:Optimize energy performanceposted by Dianne Herrin on
Hi - Our solar PV system is adding two points to our "optimize energy performance" category due to the cost offset.
District cooling
CS-v4.1 WEc3:Optimize Process Water Useposted by on
Hello,
does anyone have experience with district cooling related to option 3? What type of DC system is compliant? And what does specifically "recycled alternative water" stand for?
Frit Pattern
Pilot-Credits SSpc55:Bird collision deterrenceposted by Chelsea Miller on
Is having a frit pattern necessary if you have a really low ratio of glass to opaque surface?
Electrical Commissioning Scope
NC-v4 EAp1:Fundamental commissioning and verificationposted by Renee Azerbegi on
We have several clients who are implementing LEED v4.
Indoor Lighting Quality in LEED v4 BD+C Hospitality projects.
Hospitality-NC-v4 EQc6:Interior lightingposted by Susan Di Giulio on
Hi,
I have a few hotels working their way through LEED v4. I understand that Guestrooms should not be counted for Option 1; lighting controls.
Baseline Chillers
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Sánchez Sánchez on
Greetings,
We are working on a large project which has 10 customized Chillers each chiller over 2,000 tons.
Modeling Future Tenant Spaces
CS-2009 EAc1:Optimize Energy Performanceposted by Anna Kaelin on
As our C&S spaces are a future build out we have to predict what the fan power in our FCUs will be. We have manufactures data for all the potential FCUs that could be connected to the
Satisfaction of the authority
NC-v4 LTc3:High priority siteposted by Florian Schmidtchen on
Dear all, can anyone explain "satisfaction of the authority"? Under German law the property owner is obligated to remediate all contaminations.
Option 2 - Leadership Extraction Practices
CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Sara Johansson on
How can structure and shell only be allowed to contribute towards 30% of the compliant building material cost, when 25% is enough to fullfil this credit?
Calculate illuminance intensity for sun (direct component) and sky (diffuse component) for clear-sky
CI-v4.1 EQc7:Daylightposted by Amal Venugopal on
Hi,
We are doing the day lighting simulation for office building under LEED ID+C v4.1 rating system. We have opted the option 2 simulation approach to meet the credit requirements.