Forum quick links
Additional scope to test...what if there is no contamination found?
NC-v4 LTc3:High priority siteposted by emily reese moody on
We have a project that is not required to do site contamination testing, and does not believe there is any reason for the site to have contamination (they have always owned the site), so they did n
Outdoor Ice Rink Energy Performance
NC-v4 EAp2:Minimum energy performanceposted by Ralph Bicknese on
We are looking at LEED for a multi-purpose sports facility with indoor space and an outdoor ice rink that is not enclosed.
Group or single project for Warehouse
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Sofia Barahona on
We are currently working on a warehouse which has a total of 12,704.13m2, the project consist of a building of storage and operative offices with a total of 12,516.67m2 and a small separate spaces
62 2010 MZ Calc excel for LEED v 4.
CI-v4 EQp1:Minimum indoor air quality performanceposted by Sadaf Alam on
Hi ,
Does anyone have 62 2010 MZ Calc excel for LEED v 4.
Acoustic Performance
NC-v4.1 EQc9:Acoustic Performanceposted by Kyle Roth on
Is this credit to require all of the structure (walls, floor, floor slab, roof ect.) to be accounted for in measuring for this credit? Or just the walls?
Track light power consumption
Retail-CI-v4 EAp2:Minimum energy performanceposted by Mahesh Shankar on
This one is a retail project in Thailand. The store has many tracklights due to which we are not able to get the required power savings in lighting.
Energy modeling, Chiller at AHRI conditions
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Sánchez Sánchez on
Hi,
I’m modeling a building which has water-cooled chillers.
Submitting evidence in design or post-construction stage
NC-v4 EQc9:Acoustic performanceposted by Greenlab on
Hi,
We are in the process of replying to a LEED Certification Review – split review, design stage – of a building which is now close to completion.
Energy Model Room category for server room relevant in baseline building
NC-v4 EAc2:Optimize energy performanceposted by Benjamin Weise on
We're modelling an office building (space by space method) with a relatively big server room (50kW).
Functions of the same product
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Hashir Usman on
Hi all,