Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Clarification Re. General Emissions Requirement for Multi-part Acoustical Wall Treatment

NC-v4 EQc2:Low emitting materials
posted by  Vanessa Nelson  on 

We have a project with sound recording studios with drywall throughout and an acoustical wall treatment that will be assembled on site and attached to select portions of the drywall.

0

Industry-Wide EPD - error in description?

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Megan White  on 

Hi all, In the ref guide (p.514), it states that as part of Industry Wide EPD "the manufacturer is explicitly recognized as a participant by the program operator." However, this is the same exact

4
Mon Mar 9, 2020, 3:37 pm

Tenant-level energy simulation

Retail-CI-v4 EAp2:Minimum energy performance
posted by  Iqbal Khalilullah  on 

Dear All,

We wish to clarify on the tenant-level energy simulation for our single floor project located within 40 floors of high rise base-building.

1
Mon Mar 9, 2020, 2:24 pm

Question on who can fill the role of a CxA for enhanced commissioning

NC-v4 EAc1:Enhanced commissioning
posted by  A.J. Speicher  on 

Hello.  I had a question about who can fill the role as the CxA for the enhanced credit.  The case is where an engineering firm was hired by the architect to complete the civil/land devel

5
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Sat Mar 7, 2020, 12:50 pm

Automatic Receptacles LEED Interpretation

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Sofia Barahona  on 

We are attempting to work on a project in LEEDv4.1, which in Optimize Energy Performance states that ASHRAE 90.1-2016 mandatory provisions must be met.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Mar 6, 2020, 3:59 pm
3
Thu Mar 5, 2020, 8:55 pm

Soldering Paste for Piping Applications

NC-v4 EQc2:Low emitting materials
posted by  Shannon Oletic  on 

Does soldering paste used by the plumbing sub trade need to comply with EQ Low Emitting Material requirements for adhesives and sealants?

Appreciate your insight!

0

v2009 - SSc1: Site Selection - Wetland Protection

NC-2009 SSc1:Site Selection
posted by  Kathy Hrabovsky  on 

Is a Category 1 Forest Conservation Easement permitted to protect the limits of disturbance between a project site and an existing wetland if the project site is 60', instead of 100', from a wetlan

0

When to hire a Commissioning Agent

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Peter Davis  on 

We were alerted to this project in Design Development Phase and the next phase has been progressing while we have been hiring and negotiating with the prospective CxA.

3
Artist, Curator, Writer
Teresa Stern Arts
LEEDuser Basic Member
20 thumbs up
Thu Mar 5, 2020, 3:32 am

Forum Participation Requirement

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Michelle Rosenberger  on 

I appreciate the idea behind making forum participation part of the requirements for pilot achievement.

1
Fri Apr 17, 2020, 11:55 pm