Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Uplight - lumens emitted above horizontal

NC-v4 SSc6:Light pollution reduction
posted by  Amanda Cunningham  on 

Can anyone clarify if the maximum allowed percentage of total lumens emitted above horizontal (by lighting zone) is applied to each individual luminaire or the sum of all lumens from all luminaires

3
Wed Mar 4, 2020, 7:40 pm

Reflectance

NC-v4 EQc6:Interior lighting
posted by  Inês Marques  on 

Hi guys, I'm having troubles getting datasheets with reflectance values for the project I'm working on.

7
Wed Mar 4, 2020, 5:38 pm

Heating coil as a preheat in DOAS with VRV

CS-v4 EAp2:Minimum energy performance
posted by  Przemysław Rejczak  on 

Dear Everyone

I am quite confused because I got a review comment recently where Reviewer suggests to exclude preheat coils from Baseline System 7. 

1
Wed Mar 25, 2020, 5:30 pm

Where to look for manufacturer documentation

NC-v4 EQc2:Low emitting materials
posted by  Lissa Spitz  on 

Is it just me?  I'm having a hard time finding manufacturer documentation that confirms compliance with CDPH, aqBB, etc.

9
Wed Mar 4, 2020, 4:29 pm

LEED Basement Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Patrice McVeigh  on 

Hi, I am working on a project with 3 towers over a shared 2-storey basement. Each tower is being certified separately.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 4, 2020, 10:47 am

Question Whether Criteria Measures are Appropriate

Pilot-Credits EQpc117:Quality views in nonregularly occupied spaces
posted by  Kristina Bach  on 

In pursuing this pilot credit on our project, we wondered whether it was truly appropriate for the pilot credit to require all of the same view criteria measures as typically required in Regularly

5
Wed Mar 4, 2020, 6:53 am

LEED v4.1 Renewable Energy Production

NC-v4.1 EAc5:Renewable Energy
posted by  Ruju Rathod  on 

We are evaluating the possibility of applying for the Renewable Energy Production credit under LEEDv4.1 for an office building that is receiving renewable energy from the grid.

3
Default Avatar
Sr. Sustainable Design Specialist
HOK
LEEDuser Basic Member
1 thumbs up
Tue Mar 3, 2020, 11:13 pm
1
Tue Mar 3, 2020, 10:14 pm