Long Term Bike Storage - Distance to Building Entry

NC-v4.1 LTc6:Bicycle Facilities
posted by  Catherine Blakemore  on 

Is the 300 foot distance a radial distance from building entrance or based on walking distance, meaning the actual path a pedestrian would take to get to the bike storage location from a building e

1
Tue Mar 10, 2020, 3:29 pm
2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Feb 26, 2020, 7:56 am

Modeling of Direct Evaporative Cooling System in Baseline

NC-v4 EAp2:Minimum energy performance
posted by  Amgad Khattab  on 

I am working on a factory building, of which only the office area (10%) is conditioned using split A/C systems and the factory area (90%) is being cooled by using direct evaporative cooling system.

7
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Feb 26, 2020, 2:31 am

Energy prerequisites

Hospitality-CI-v4.1 EAp2:Minimum Energy Performance
posted by  Jorge Lopez de Obeso  on 

Hi, is has come to my attention that the prerequisites and credits from this forum differs from those listed in the LEED 4.1 Reference Guide.

0
3
Tue Feb 25, 2020, 4:04 pm

Integrative process phase

NC-v4 IPc1:Integrative process
posted by  Marion THIBAULT  on 

Hello,
My client wishes to have his project certified in LEED V4.

4
Tue Feb 25, 2020, 2:00 pm
1
Wed Feb 26, 2020, 6:37 pm

ASHRAE Baseline HVAC System for Hospitality project

Hospitality-NC-v4 EAp2:Minimum energy performance
posted by  Nikos Tsitsikas  on 

Hi all,

Can I pick someone's brain about which ASHRAE Baseline HVAC system we should be selecting for a Hospitality project we are working on?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Feb 25, 2020, 9:17 am