Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Appendix 4. Table 1. Base Ratios for Parking

Warehouses-NC-v4.1 LTc7:Reduced Parking Footprint
posted by  Sonny Calma  on 

How do we calculate parking spaces using the Table for Base ratios for a warehouse with attached two-level office buildings? The predominant space is the warehouse.

0

Covered Basket ball court in roof

Warehouses-NC-v4.1 SSc3:Open Space
posted by  Sonny Calma  on 

Does the covered basketball court on the roof qualify for open space credit?

0

Requirement of Measurement for a new ventilation system

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Krithikha Muthukrishnan  on 

We are working on an existing factory project. It is mechnically ventilated in most spaces and those have been measured.

1
Fri Nov 22, 2024, 11:57 am

Daylight Calculator

NC-v4.1 EQc7:Daylight
posted by  Junaid Mujahid  on 

The LEED v4.1 requires area input for which the lux levels are within the range for 9am AND 3pm.

2
Default Avatar
Sustainability Engineer
PNC Architects (Sobha Realty)
LEEDuser Basic Member
2 thumbs up
Wed Nov 20, 2024, 3:03 pm

Pilot Credit: Procurement of Low Carbon Materials

CS-v4 INc1:Innovation
posted by  Michelle Bombeck  on 

Hi all - Just sharing our experience so far with this pilot credit, as required... We're pursuing this credit on a large speculative CS office project in WA.

3
Tue Nov 19, 2024, 6:37 pm

Baseline Exhaust Energy Heat Recovery

CI-v4 EAc2:Optimize energy performance
posted by  Ciaran McCabe  on 

In ASHRAE 90.1 Table 6.5.6.1 - Exhaust Energy Recovery Requirement where they mention % Outdoor Air at Full Design Airflow Rate are they referring to the "minimum outdoor air" value ?

4
Tue Nov 19, 2024, 10:16 am