Forum quick links
EVSE - ISO 15118 compliance
NC-v4.1 LTc8:Electric Vehiclesposted by Mike Cavanaugh on
I'm looking into substituting this credit and pursuing option 1 (2% of spaces) but have a question about the third criteria for EVSE - Vehicle to Grid (ISO 15118) compliance. I've r
Alternative Water Source - Treated Off-Site Harvested Water
NC-v4 WEc2:Indoor water use reductionposted by Vincent Pieri on
Greetings!
NC-v4.1 EAp2
NC-v4.1 EAp2:Minimum Energy Performanceposted by Takashi Hasegawa on
Hi,
Can anyone please check if my understanding is correct, which is on the relationship between LEED V.4.1 and ASHRAE90.1 2016? Below is how I understand;
Off-site Renewable/Solar Energy
CI-v4 EAp2:Minimum energy performanceposted by Rahil Shah on
Hello,
Renewable energy production DES Path 1
NC-v4 EAc5:Renewable energy productionposted by Lisa Loreti on
We are modeling a building connected to a DES and we decided to follow Option1 - Path1 for energy modelling.
How to cal kw/cfm
EBOM-v4.1 EAp3:Energy Performanceposted by Oatto Promsrisawat on
good morning every body as
1. I have input motor on specification 442 Watts (it include power factor or not)
2. I have cfm 1333 cfm
Single occcupant rooms for brief and silent work - thermal controls required?
CI-v4 EAc2:Optimize energy performanceposted by Andrzej Gutowski on
Dear collegues,
Pilot credit Vs LEED V4
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Javier Garcia Jones on
We are working in project that it's using pilot credit. We would like to know if there are any learned lessons for V4 credit. Do you have any experience with this issue?. Thanks in advantage