Lighting Power Density Allowance for covered parking areas
NC-v4 EAp2:Minimum energy performanceposted by Thanh Le on
I have a project with covered parking areas. In ASHRAE 2010 - Table 9.4.3B, there is no category for covered parking areas. How can I determine LPD Allowance for this area?
Thanks!
Previoulsly developed site
CS-v4 LTc2:Sensitive land protectionposted by MARIA ESTHER LAMADRID on
Does a Project that is located inside a previously developed industrial park count as previously developed to comply with option 1 or do i have to go for option 2?
Zones served by mutli-zone unit but is exhausted separately
NC-2009 IEQp1:Minimum IAQ Performanceposted by Edgar Arevalo on
This may be nothing, but should I still count for zones that are served by a multizone unit but the ventilated air is not recirculated back to the unit? The air is pretty much exhausted throu
ASHRAE Lighting Mandatory Requirements for Projects Outside the US
NC-v4 EAp2:Minimum energy performanceposted by Donn Doe on
Good Day,
We are working on a project outside the US and would like to clarify if there are any options that speak to the following;
Product Category Testing as per GB China standards.
CI-v4 EQc2:Low emitting materialsposted by Mahesh Shankar on
We have a CI Office project in Shanghai, where we are attempting for Low Emitting materials credit. The testing for three categories of materials that we have, are as per GB China standards.
RCI Visual Inspections - STILL???
NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Kimberlee Ilardi on
We have a project that is using a Certified Commingled Recycling Facility for their single-stream recycling and they are giving us visual inspections, with a breakdown of each waste strea
About gowning rooms in ASHRAE 62.1
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jorng-ren Chern on
Shall we include gowning room for cleanroom project in VRP in IEQp1?
Exterior Noise Control
Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise controlposted by Alan Burt on
This project had several challenges related to exterior noise, it is in a busy area near downtown and at the time exposed to higher than typical noise levels from the exhaust system serving an unde
LEEDv4.1, EQ Cr – Indoor Air Quality Assessment, Option 2, Path 2 – Volatile Organic Compound
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Devendra Chaughule on
Hi All,
The credit mentions screening test for Total Volatile Organic Compounds (TVOC) and to test individual volatile organic compounds listed in Table 2.