Penitentiary Confinement Cells -- Considered Residential or Nonresidential?
NC-v4 EAp2:Minimum energy performanceposted by Pooja Sannamani on
Hello,
Does anyone know if penitentiary confinement cells are considered residential or nonresidential per Appendix G when choosing the Baseline system type?
Setback requirement
NC-v4 EAp2:Minimum energy performanceposted by Sofia Barahona on
Hi,
We are working on an office building where some private offices are served by split system. How does the setback requirement is met on these specific HVAC system?
How to determine "potentially critical zones"?
NC-v4 EQp1:Minimum indoor air quality performanceposted by RDK E&S on
I understand that critical zones are zones that require the largest outdoor air fraction.
USGBC Acknowledged alternatives for Projects outside US
ND-v4 GIBp2:Minimum building energy performanceposted by Benjamin Weise on
Hi there!
Water-Side HVAC calculator Baseline and Proposed model inputs
NC-v4 EAp2:Minimum energy performanceposted by Norbert Harmathy on
Dear Sir/Madam,
Theater and Gallery
NC-v4 EQc8:Quality viewsposted by Summer on
We have a museum project that has 3 galleries and theater or performance area.
LEED for Homes with Exterior Energy Uses- Prescriptive
Homes-v4 EAc1:Annual energy useposted by Angela Loughry on
I am working on a home that has significant energy uses not in a HERS rating - exterior pool and snowmelt. I understand that you can go Option 1 under annual energy use. What is unclear
Heat Recovery Exceptions - Baseline Adjustments
NC-v4 EAp2:Minimum energy performanceposted by RDK E&S on
Hi, I'm working on a 2-story 140,000 sf manufacturing facility and wanted some feedback on how to best set up the Baseline. The facility is compromised of a significant amount of office, wareh
CxA Role - Limited central plant installed
CS-v4 EAc1:Enhanced commissioningposted by Ciaran McCabe on
Claim savings with reference to tenant fit out lighting drawings in lieu of tenant lease agreement
CS-2009 EAp2:Minimum Energy Performanceposted by Eric Dixon on
I have a situation where my company has been contracted to design and submit for LEED both the C&S for the building developer, and the CI for the tenant.