Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Lifecycle Assessment Option 2, Path 4 "Salvaged Materials"

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Teeba Alja  on 

did anyone targeted Option 2, Path 4 and included recycled steel and rebars as "salvaged/reused"  materials.

0

Baseline for Botanical Garden Areas of a Building

NC-v4 EAp2:Minimum energy performance
posted by     on 

How do we model the baseline systems for an indoor botanical garden?

3
Default Avatar
LEEDuser Premium Member
0 thumbs up
Fri Nov 1, 2024, 1:45 pm

Space definition type

CI-v4.1 EQc9:Acoustic Performance
posted by  Ricardo Hernandez  on 

If I have a lounge \ cafe trying to accomplish the credit of acoustic performance, under which category would be rated if it is an open space only with a division floor to ceiling in the service ar

0
3
Thu Oct 31, 2024, 1:27 pm

Legal Wood -

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Theresa Lehman  on 

Does anyone know if the Legal Wood pilot is used is lieu of FSC Wood requirements, does the woodworker who is making the cabinets out of FSC, or any other acceptabl e certification program (SFI, AT

3
Director of Sustainable Services
Miron Construction Co., Inc.
LEEDuser Premium Member
40 thumbs up
Wed Oct 30, 2024, 8:41 pm

LEED 5

EBOM-v4.1 SSc4:Site Management
posted by  Candido Rosario  on 

Thank you for the opportunity to provide feedback on LEED Version 5.

0

Errors in v4.1 MEPC Excel Sheet

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Junaid Mujahid  on 

What is the best way to resolve errors with the v4.1 MEPC?

1
Fri Nov 8, 2024, 1:18 pm

Mechanical Ventilation Hotel Room

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Emanuele Contaldo  on 

Hi, 

I am supporting the design team for an hospitality building, rooms will be mechanically ventilated and will be composed by a bedroom, a living area and a bathroom.

3
Sat Oct 26, 2024, 2:54 am

Project Occupancy when we are only complying with Indoor Water Use Reduction prerequisite under prescriptive path?

CI-v4 WEp1:Indoor water use reduction
posted by  Edgar Arevalo  on 

So we have an interior fit out project where we can only comply with the Indoor Water Use Reduction prerequisite and not the credit.  Since we are only complying with the prerequisite via

1
Fri Jan 31, 2025, 3:20 am

LCA for only furniture, is it possible?

CI-v4.1 MRc2:Interiors Life-Cycle Impact Reduction
posted by  Eslam Ahmed  on 

We are currently working on a LEED ID+C certification project. It involves a rental space where our customer is just the tenant, who will take over the space fully finished.

2
Sat Aug 30, 2025, 1:00 pm