Material Reuse Multiplier

NC-v4.1 MRc3:Sourcing of Raw Materials
posted by  Tommy Linstroth  on 

If Material Reuse is valued at 200%, the cap of a product not being able to be valued at more than 100% of its total sustainability attributes must now be gone in v4.1?

1
Tue Nov 5, 2019, 3:48 pm

Envelope Cx Testing

NC-v4 EAc1:Enhanced commissioning
posted by  Erin Rowe  on 

I'm working on a project with envelope commissioning. It is a large data center type building.

1
Tue Nov 5, 2019, 2:46 am

Equipment Power Density for Plant Room

CS-v4.1 EAc2:Optimize Energy Performance
posted by  Chi Hung Yip  on 

I need to input a figure for the equipment power density for plant room, but I do not have such figure in my design brief. Can anyone tell me the reference value with the supporting source?

3
Mon Nov 4, 2019, 11:13 pm
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Nov 4, 2019, 4:09 pm

7.6.1.2 Extracting Fan Power – Baseline Design

NC-v4 EAc2:Optimize energy performance
posted by  Amal Venugopal  on 

Hi Sir,

Greetings!

The following content is copied from,

1
Fri Dec 20, 2019, 4:01 pm

Ventilation in Corridors

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Sofia Barahona  on 

We have a question regarding the ventilation requirements on corridors in order to comply with requirements of Minimum Indoor Air Quality Performance prerrequisite.

3
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Mon Nov 4, 2019, 12:44 pm

Innovation Credit: Walkable Project Site

CI-v4 INc1:Innovation
posted by  Patty Lloyd  on 

The base building achieved this, which was seeking LEED v3 CS. At that time it was pilot credit SSpc14.

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Mon Nov 4, 2019, 8:43 am
4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Nov 1, 2019, 7:56 am