Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Leakage Test Requirement

NC-v4.1 EQp2:Environmental Tobacco Smoke Control
posted by  Mario Angelo Pinoli  on 

Hi,

 

I have an high rise residential project and the property wants to permit people to smoke on the balconies.

1
Tue Nov 12, 2019, 8:52 pm

Campus bus line must provide transportation to the public

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Dominique Serrette  on 

The project is on a campus with access to several campus bus lines within one-quarter mile of the project.

0
1
Thu Oct 24, 2019, 12:32 pm

Applicability to Airport Terminals

NC-v4 EQc9:Acoustic performance
posted by  Allan Robles  on 

Hello LEEDuser community, 

2
Partner
Longman Lindsey
LEEDuser Expert
6 thumbs up
Wed Oct 23, 2019, 8:03 pm

LEED-BD+C Hospitality - MRc5 Option 2 for a modular building.

NC-v4 MRc5:Construction and demolition waste management
posted by  Susan Di Giulio  on 

Our project is a hotel for which all guestrooms are being manufactured as modular units. This will certainly save waste, and we are interested in pursuing Option 2.

3
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Wed Oct 23, 2019, 10:55 am

How can i assure compliance for low emmetting materials? A+ and ECOLABEL certification?

NC-v4 EQc2:Low emitting materials
posted by  Sara BENLOUBA  on 

ECOLABEL and A+ certification are sufficient for compliance or we must also  quantify VOC and Formaldehyde emissions of our project by measuring? I am lost on this credit.

1
Tue Oct 22, 2019, 10:32 pm
2
Default Avatar
Sumac Inc.
LEEDuser Basic Member
20 thumbs up
Tue Oct 22, 2019, 2:20 pm

Average flow rate

NC-v4 WEc2:Indoor water use reduction
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, In the last version of the indoor water use calculator, which can be downloaded here:

5
Tue Oct 22, 2019, 1:32 pm