Forum quick links
Post-consumer recycled content vs pre-consumer recycled content - LEED V3 excel datasheet
NC-v4.1 MRc4:Material Ingredientsposted by Mateus Souki on
I am working on a project where I must choose the materials for the MRc4 credit - LEED V3 (gold certification).
Entryways systems in Retails places out the LEED certification
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Mauricio Ramirez on
Hello Dear I´m writing you because i have a doubt about the entryways systems in my project C&S v4.
Baseline: Data Center HVAC system
NC-v4 EAp2:Minimum energy performanceposted by Marica Marzari on
Hi All,
I'm modeling a Data Center that include Data Hall, offices, workshops and a lot of technical rooms.
How can I model the Baseline HVAC system? Because:
MRc2
NC-2009 MRc2:Construction Waste Managementposted by Victoria Rios Esteve on
Hi! We have a building in the process of certification which changed its initial contractor to another company.
Metering Requirements
CI-v4 EAc3:Advanced energy meteringposted by Ricardo Sá on
Dear All,
We’re currently trying to certify a project with the following characteristics:
PCB Waste considered Hazardous Material, not to be tracked?
NC-2009 MRc2:Construction Waste Managementposted by William LaRose on
I am tracking demolition waste from several structures that were removed to make room for my current LEED project.
Hair washing sinks in a hair-salon
CI-v4 WEp1:Indoor water use reductionposted by Robin Dukelow on
Hello, I am wondering if a hair washing sink/spray valve are considered process water and excluded from the Indoor Water Use Calculator, or if they should be included. Thanks!
SMACNA guidelines
NC-v4 EQc3:Construction indoor air quality management planposted by Anushka Singh on
Is it compulsory to follow all SMACNA guidelines to achieve this credit? or you can leave out a few and still earn the credit?
what is the international standard for air filters?
NC-v4 EQc3:Construction indoor air quality management planposted by Anushka Singh on
The CEN - EN 779 for air filter performance is currently inactive?
CIAQ before occupancy change
NC-v4 EQc3:Construction indoor air quality management planposted by Anushka Singh on
Why was Construction Indoor Air Quality Management Plan - Before occupancy changed to Indoor Air quality Assessment?