Forum quick links
Base Building HVAC Systems
CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hi,
I am modeling one floor of a 31 story building, I would like to verify the following:
Time limit for a project completion
Healthcare-v4 MPR2:Must use reasonable LEED boundariesposted by Mario S. on
An existing building will be under major renovation and we plan is to get it certified.
For technical and administrative reasons, the project completion may take around 7 years.
Sun Shades as "view-preserving automated shades" and north-face glazing - Option 2: Prescriptive
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Edgar Arevalo on
Currently the VLTxWFR values for each regularly occupied space is higher than 0.18
Accounting for Sun Shade as view-preserving automated shades and North facing glazing -
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Edgar Arevalo on
Currently the VLTxWFR values for each regularly occupied space is higher than 0.18
Prescriptive: Automated shades for only some windows in space
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Kristina Bach on
A corner room in our project has windows on two sides (North + West). Currently, the project is designed to include view-preserving automated shades for just the west wall.
Enhanced IAQ Strategies, applicable Entries Querie.
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Angel Giovani Bernal on
Hi everybody.
I'm working on a commercial interiors project located on the 9th, 12th, 14th & 15th floor.
Wood Veneers and Plastic Laminates
CI-v4.1 EQc2:Low Emitting Materialsposted by Alex Rodriguez on
Do Wood Veneers and Plastic Laminates need to be NAUF or ULEF?
Thank you!
AHU Fan Power Requirement
CS-2009 EAp2:Minimum Energy Performanceposted by Summer on
I have a CS project in which the AHU will be provided by the tenant, since our energy modelling has been already simulated, we have no energy savings because of the missing information for the AHU
Servers, routers, switches
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Susan Walker-Meere on
Hi, Would you clarify if routers and switches should be included in the list?
NC-2009 SSc5.1 - Site Development—Protect or Restore Habitat - VEGETATED AREAS
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Maria Peralta on
Hello!,
I have a doubt regarding to this credit.