Forum quick links
Natural Ventilation: LEED Energy modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Sadaf Alam on
Dear all,
Service Water Heating DHW flow rate in the v4 Minimum Energy Performance Calculator
NC-v4 EAp2:Minimum energy performanceposted by on
We are working on a large hotel, and are concerned with the "Modeled DHW Flow Rate gallons/minute" results we are getting from the "Service Water Heating" portion of the calculator. We've dou
Base HVAC System for a Data Center / Server Room ASHRAE 90.1 - 2007
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
- Modeling a Data Center: 1,682.34 sq. ft.
- Call Center: 8,389 sq.
IPM Tracking Tool
EBOM-v4 EQc9:Integrated pest managementposted by Catalyst Partners on
The form requires teams to upload a "IPM Tracking Tool" which is not available on USGBC LEED Credit resources page or here on LEEDuser. Anyone know what it looks like or have it?
What could be considered as "physically accesible"?
NC-v4 SSc3:Open spaceposted by Pablo Muñoz on
Could we consider physically accesible a roof open to all tenants but without an elevator (the only way to get there is through the stairs)?
Innovation: WELL Features in v3
NC-2009 IDc1:Innovation in Designposted by Agnieszka Rylska on
Hello,
I would like to ask if innovation credit from LEED v4 ‘WELL Features’ can be acceptable in LEED v3 in the innovation category?
Thank you in advance for your answer.
CxA to be an individual
NC-v4 EAp1:Fundamental commissioning and verificationposted by Omar Elrawy on
Concerning all projects (either under or above 20,000 sqft), can the Cx Authority be an individual and not an organization?
Concrete bonding agent below slab on grade
NC-v4 EQc2:Low emitting materialsposted by Vandita Mudgal on
We have to use a strong concrete bonding agent below a 2 to 3" Slab on grade to stick with the concrete foundation below the structure.
exemplary performance in v6 form
NC-2009 EAc6:Green powerposted by Elizabeth Eason on
Is the exemplary performance point still available? The new form v6 does not have the option for selecting exemplary performance.
Remove Process Equipment?
NC-v4 EAc7:Green power and carbon offsetsposted by RDK E&S on
I'm working on a manufacturing facility that is attempting to achieve this credit. Are process or any other loads eligible to excluded from the total energy consumption for estimates?