Forum quick links
Forum
Topic
Replies
Recent
Compliance to ASHRAE 90.1-2010 - Dimming Lights
CS-v4 EAp2:Minimum energy performanceposted by Summer on
I'm working on an office project located at the top of a 3-level podium and has a 4-level basement parking.
1
Tue Sep 3, 2019, 7:57 pm
Compliance to ASHRAE 90.1-2010 - Dimming Lights
CS-v4 LTc7:Reduced parking footprintposted by Summer on
I'm working on an office project located at the top of a 3-level podium and has a 4-level basement parking.
0
Pumps in LEED Energy Models
CI-v4 EAc2:Optimize energy performanceposted by Ciaran McCabe on
Hi, Is there a list of the pumps that's should be included in the Proposed Ashrae 90.1 LEED energy model. For example should cold or hot water pressurisation pumps be included?
1
Wed Aug 14, 2019, 12:08 am
Addition to an existing airport terminal
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Ricardo Sá on
Dear All,
4
Tue Aug 13, 2019, 5:26 pm
Monitoring-based Cx for CS projects
CS-v4 EAc1:Enhanced commissioningposted by Shannon Oletic on
What are the required measurement points for a core and shell project?
2
Tue Aug 13, 2019, 5:09 pm
4
Tue Aug 13, 2019, 3:41 pm
1
Fri Aug 16, 2019, 5:50 pm
USGBC approved equivalent for ASHRAE standards
CI-v4 EAp1:Fundamental commissioning and verificationposted by Alexander Spilger on
Hi,
2
Sun Aug 11, 2019, 10:30 pm
Enhanced Commissioning
NC-v4 EAp1:Fundamental commissioning and verificationposted by saif eddine majdaoui on
We are working on a big project, we are the LEED subcontractor (consultant) of the general contractor (All trades),
3
Sun Aug 11, 2019, 9:49 pm