Forum quick links
EAp1-Fundamental Commissioning and Verification - OPR / BOD
NC-v4 EAp1:Fundamental commissioning and verificationposted by Maria Peralta on
Hello, I have a question regarding the OPR and BOD documents.
LEED v4 CI EAb Opt. Energy Perf. : Option 2 : AEDG Maximum Project Size requirements
CI-v4 EAc2:Optimize energy performanceposted by Kristen Callori on
Our project is an existing 300,000 sf Office building. Our client is both the new owner and will be the sole tenant.
"Meeting but not Exceeding Local Zoning requirements" and Building Type based on local zoning
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Edgar Arevalo on
1) I have been carefully looking over the description for achieving this credit under Case, Option 1, and what I find confusing is how it says in the handbook, "Size parking capacity must meet but
minor improvements within the water body body buffers: grade changes necessary to ensure public access
NC-v4 LTc2:Sensitive land protectionposted by Louise Schlatter on
Hi. I have a question about minor improvements within the water body body buffer. It says "grade changes necessary to ensure public access." We have a small First Order strea
FSC wood
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Hoda Ibrahim on
Can I use imported FSC wood as raw material and locally manufactured or FSC shall be locally harvested ?
Option 1 - Flushout of Non-Occupied Spaces
NC-v4 EQc4:Indoor air quality assessmentposted by Mike Bahr on
My project is a mid-rise building with the lower 5 levels being open air parking. Is that required to be flushed, and meet humidity and temperature requirements?
Charging station capacity - Option 2 Electric vehicles
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Frantisek Macholda on
Dear all,
Locally Sourced materials definition
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Elizabeth Kertesz on
The reference guide says that products sourced (extracted, manufactured, purchased) within 100 miles of the site are valued at 200% of their cost.
MERV 11 in garage unit
NC-v4 EQp1:Minimum indoor air quality performanceposted by Johanna Koch on
Do you have to have MERV 11 filters installed in the ventilation unit that is connected to a garage?
not unreasonably exclude space... must distinguish from any non-certifying space... Complete building or space MPR in disguise?
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Ward Miller on
Maria & Merve - great questions!