Forum quick links
Extended Producer Program meets Waste Management
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Mike Bahr on
This credit gives the option to use products that are purchased from a manufacturer that participates in an extended producer responsibility program to meet the requirements.
we c1
NC-v4 WEp1:Outdoor water use reductionposted by Maria Peralta on
Hello!
I have an enquiry regarding this credit.
usgbc leed online site very slow and times out
NC-v4 MPR1:Must be in a permanent location on existing landposted by Christopher Cowie on
why is the usgbc leed online site so slow? I can bearly work on line and the site keeps timing out.
Definition of product distribution, and final manufacturing and documentation
NC-v4.1 MRc2:Environmental Product Declarationsposted by Allison Para on
Working for a architectural building product manufacturer in Sustainable Design Office.
Option 3, Exterior wall repair and repointing
NC-v4 MRc1:Building life-cycle impact reductionposted by Edgar Arevalo on
For this project, certain brick enclosure sections of exterior wall area are to undergo repair and repoint since they are damaged. Since repair isn't necessarily considered replacement, which
NC-v4 LTc3: High priority site as ACP
NC-2009 SSc3:Brownfield Redevelopmentposted by Heather Appell on
Has anyone tried to pursue LEEDv4 LT High Priority Site as an alternative compliance path for SSc3 Brownfield Redevelopment?
Thermal storage and Optimize Energy Performance
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Hell to all LEED users,
We are examininig to implement in out project a ice thermal storage systems.
The charges during the the night are better than during the day.
Are Electric bikes taken into account in LEED?
NC-v4.1 LTc8:Electric Vehiclesposted by Maria sAra Di maggio on
Hi! Are electric bicycles considered electric vehicles? So is the LEED credit NC-v4.1 LTc8 - Electric Vehicles applicable to Bikes?
Lighting group control for On/Off/Mid Lighting control requirement
NC-v4 EQc6:Interior lightingposted by Thomas Tan on
Dear LEEDusers,
We have a project with a manufacturing space to pursue the Interior lighting control credit. Dimmers for task lights is not acceptable as safety issue.