Forum quick links
CI-v4 LTc3 - Access to quality transit - trip questions
CI-v4 LTc3:Access to quality transitposted by Don Blair on
Question 1: If a city bus that serves a bus stop within a 1/4 mile of our project has bus trips only on weekdays and not on the weekend, can I still count the&nbs
LEED v4-Credits MR-USGBC approved program
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Dipti Talwar on
Dear all, about MRc3 in LEED v4, could I have more information or links where can I find information especially about USGBC approved program? Thank you in advance!
CS EA credit Enhanced Cx - who can serve as CxA
CS-v4 EAc1:Enhanced commissioningposted by Deeta Bernstein on
Any precedent in pursuing the Enhanced Cx credits with a CxA who is also the design engineer for P/FP/FA, but is not providing M/E design?
Any way to exclude non-electrical consumption
NC-v4 EAc7:Green power and carbon offsetsposted by Edgar Arevalo on
The client wants us to pursue this credit with the hopes of achieving two points, for this project we are consuming both electricity and natural gas as per the energy model. However, the clie
Electrical Buses as an Innovation Credit
NC-v4 INc1:Innovationposted by on
A Mass transit project will be using Electric buses to serve the routes. As for LTc8 Green Vehicles, the project already has preferred parking and EV charging stations covered.
Option 2 - Priority Designation
CS-v4 LTc3:High priority siteposted by Peter Doo on
My project site has a mixed-use zoning designation by the County in which it resides.
sales area and the location of bins
CI-v4 MRp1:Storage and collection of recyclablesposted by Agnieszka Rylska on
Hello,
Heated Only Residential Zones in 90.1 Appendix G
NC-v4 EAp2:Minimum energy performanceposted by Omer Moltay on
Hi,
This has been bogging us for a while, as we cannot figure out how to interpret the various issues in ASHRAE 90.1.
Commissioning of Existing Equipment
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jatuwat Varodompun on
We have a major renovation project which is 40% of gross area. Do we need to commissioning the equipment of existing equipment of the rest 60%.