Off-site still available?
NC-v4 SSc3:Open spaceposted by Abigail Chan on
In previous versions of LEED, it seems as if the open space credit allowed for project developers to improve/restore off-site areas to achieve this credit (with 2 square feet offsite = 1 square foo
FAR Requirement
NC-v4.1 SSc3:Open Spaceposted by Jesse Hunt on
It appears that the v4.1 language for the credit omits the FAR requirement from LEED v4.
Who can be a qualified CXA to do the LEED V4 Enhanced Commissioning in the Design Build Project ?
NC-v4 EAc1:Enhanced commissioningposted by Benchito Herrera on
Can a Gen. Contractor hire a CXA in the Design Build Project for LEED V4 Enhance Commisioning?What are the requirements?
Thanks..
Does this Pilot ACP work for the v4.1 version of Raw Material Extraction?
Pilot-Credits MRpc102:Legal Woodposted by Nadav Malin on
The relevant requirements in the v4.1 version of the credit are basically the same, so it would be easy to see how this ACP could apply, but the v4.1 credit is structured differently (no more Optio
CEE Tier 3A Washer Requirement
NC-v4 WEp2:Indoor water use reductionposted by Katie Fluence on
This prerequisite calls for all commercial washing machines to meet CEE Tier 3a, however the CEE website indicates that the commercial washing machine program is currently suspended in order to be
Campus possiblity
Schools-EBOM-v4 MPR3:Must comply with project size requirementsposted by Helena Garcia on
Hello LEEDusers!
Estimating the Peak Visitors
CS-v4 LTc6:Bicycle facilitiesposted by Ciaran McCabe on
Hi,
Is there an accepted methodology for calculating the number of peak visitors. I am working on a Core & Shell Office therefore its not straightforward to estimate ?
ENERGY STAR certified washer/dryer combos?
NC-2009 EAp2:Minimum Energy Performanceposted by Danielle Waters on
If ENERGY STAR does not have a certification for dryers or washer/dryer combos, are combos excluded from the prerequisite?