Area of Nonroof Measures

NC-v4.1 SSc5:Heat Island Reduction
posted by  Yannick Fluck  on 

"Provide shade with architectural devices or structures":

Does this include the facade of an architectural building?

1
Mon Jul 8, 2019, 6:47 pm

Joint Use of Facilities Credit Use!

Schools-2009 SSc10:Joint Use of Facilities
posted by  Bayardo Selva  on 

I submitted a Memo on Letterhead stating which parts of the facilities where going to be used on non school hours. However, LEED also wants an a Shared use policy?

0

The number of water meters required

CS-v4 WEc4:Water metering
posted by  Erkki Seinre  on 

How detailed does the sub-metering have to be to account for 'at least 80% metered subsystem'?

1
Tue May 10, 2022, 11:16 am

Basic Amenities Within the Main Building

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Aswin M  on 

We have a Retail Commercial Interior project inside a Main building. The Main building has many amenities such as restaurant,library, departmental stores, beauty salon, etc,.

5
Senior Sustainability Manager
JLL
LEEDuser Basic Member
10 thumbs up
Sun Jul 7, 2019, 10:56 am
1
Wed Jul 10, 2019, 9:00 pm

How to calculate 5% of the site’s vegetated area (excluding preserved or restored habitat area)?

Pilot-Credits SSpc82:Local food production
posted by  Adriana Hansen  on 

Hi everyone, as my team was studying the Local food production requirements, there was a doubt about how to address to the BD+C area requirement below:

0

Measurements for CO2 / TVOC

Hospitality-EBOM-v4.1 EQp4:Indoor Environmental Quality Performance
posted by  Denaye Hinds  on 

Where should these measurements be taken throughout the property/building and how many per zone are required?  

 

 

0
2
Energy Analyst & Energy Systems Design Engineer
HKS
LEEDuser Expert
7 thumbs up
Wed Jul 3, 2019, 9:09 pm

Occupancy date for Core and Shell

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Edgar Arevalo  on 

Regarding the MERV-8 filter section of this credit, which is for a C&S project, no tenant occupancy dates have been established.  Should I just wait til we get the first tenant occupancy d

0