Forum quick links
Daylight simulation
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Danielle Waters on
If a project is running a simulation that shows the LUX color levels for each room on the plan, would the project have to still fill out a v2009 Daylight calculator?
Interior Reuse - shared walls with other businesses
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Lou Niles II on
Hello Can anyone give some advice on including Both sides or one side of interior walls for a Tenant Improvement where the other side of the wall is a space not in the scope.
Modeling Electric Heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
Hi,
Size of shower and changing facilities
Data-Centers-NC-v4 LTc6:Bicycle facilitiesposted by Marion THIBAULT on
Hi,
Do we have minimum requirements for the size and configuration of changing facility shower ?
Thanks
Marion
Core and shell building’s energy
CS-v4 EAc5:Renewable energy productionposted by Devendra Chaughule on
Dear All,
We are doing a LEEDv4 CS project. For applying this credit, we need to engage 50%-100% (1-2 points) of total energy to be addressed by green power, REC and or offsets.
Use of bidets
NC-v4 WEp2:Indoor water use reductionposted by Jorge Adalberto Bernal Segovia on
Hello,
Seven Point Scale for Occupant Comfort Survey
EBOM-v4 EQc10:Occupant comfort surveyposted by Alex Goulden on
Hello,