Forum quick links
Core Shell Daylighting
CS-v4 EAp2:Minimum energy performanceposted by Lorey Flick on
My core and shell building is over 400K SF. The majority of which is tenant space that is NOT fit out. There is no way of knowing a typical layout given the large, varying floor plate.
Reasonable Project Site Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Katherine Norris on
Hello! The project I am working on is a full renovation of a historic building on a University campus. The building has three wings connected by "hyphens" to effectively form an "E" sha
Trips
CI-v4 LTc3:Access to quality transitposted by Kristopher Croghan on
Is the use of the word "trips" being used for "stops" or is "trips" being used for the number of people taking that route?
Back-Painted Glass
CI-v4 EQc2:Low emitting materialsposted by Diana Smiciklas on
Hello everyone,
Would back-painted glass be considered inherently non-emitting assuming that the paint is applied offsite?
CI-v4.1 BPDO - Environmental Product Declarations and Material Ingredients
CI-v4.1 MRc5:Material Ingredientsposted by Wayne Mc Fall on
Hi,
I'm looking for some assistance in relation to the materials credits, namely:
1. Environmental Product Declarations
2. Material Ingredients
LEED v4.1
CI-v4.1 IPc1:Integrative Processposted by Mohamed Hassan on
Are the (REFERENCE GUIDE FOR INTERIOR DESIGN AND CONSTRUCTION v4.1) are Available in store?
Invoices submission for final review
NC-2009 MRc7:Certified Woodposted by Mohamed Hanifa on
Dear Sir,
entryway walk-off system in front of each retail shop in CS?
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Alicja Bieszyńska on
Our project is a mixed use building where groundfloor constitutes retail services and floors from one up are for tenants. Taking into account that this is a CS certification, do we need to install
ASHRAE Level 1 Energy Audit
EBOM-v4.1 EAp1:Energy Efficiency Best Management Practicesposted by Ben McEwen on
Regarding the Energy Audit Prerequisite, is there an acceptable age range for a pre-existing energy Audit that was conducted on the building in question?