Forum quick links
Renewable Energy unable to be commissioned due to delays, can we still submit for LEED review?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Rachel Manoguerra on
The project I am working on is "complete" and the owner wants to submit for final LEED review. However, the PV has been delayed and not installed on the project.
Enhanced Commissioning and Measurement and Verification
NC-2009 EAc3:Enhanced Commissioningposted by Saju Varghese on
Hello, It been a little hard to draw the line between the enhanced commissioning scope and the measurement and verification scope.
Monitoring-based Cx frequency of analysis and approach clarification
NC-v4 EAc1:Enhanced commissioningposted by Kevin Day on
LEED reference manual states "MBCx can be accomplished via systems submetering, operational points trending, and real-time analyses, such as fault detection and sequence verification."
Drawing Review
NC-v4 EAp1:Fundamental commissioning and verificationposted by Steve Connelly on
Is a drawing review of the building envelope required by EAp1 Fundamental Cx if Enhanced Option 2 is not being pursued?
Onsite Apiary
Pilot-Credits SSpc82:Local food productionposted by Stephen Ward on
Does having an apiary on our campus count towards the amount of area reserved onsite for food production?
Calculating landscaping
NC-v4 SSc2:Site development - protect or restore habitatposted by Tracy Jordre on
My question is related to both the Protect or Restore Habitat and Open Space credits. In the past I have included the total area of any landscaping bed, not just the area of each plant themse
Artificial Turf - Considered Hardscape?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Marina Wrensch on
I am working on the LEED documentation for SSc7.1 for a softball stadium. The infield is clay and the outfield is artificial turf.
E-waste
CI-v4 MRp1:Storage and collection of recyclablesposted by Agnieszka Rylska on
Is it enought that the tenant only will provide a safe storage for e-waste or is it required that the building also provides a central storage for all tenants?
Software for Energy Modelling
NC-v4 EAc2:Optimize energy performanceposted by Andrea Valentini on
Hello.
I'm working on a project in Italy and evaluating to buy a new BIM software.
Is there anyone who knows if it's possible to analyze our building with a proper BIM SW?
Shared walls with another structure in baseline and proposed
NC-v4 EAc2:Optimize energy performanceposted by Christine McKinley on
Hello,
In my baseline model, can I show shared walls as exposed to exterior and then in my proposed model treat that wall as a partition?