Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

On-Site Renewable Purchase Agreement

NC-2009 EAc2:On-Site Renewable Energy
posted by  Kristen Gomez  on 

I am working on a project which install PV panels on the roof.

1
Mon Apr 15, 2019, 6:22 pm

Infill Development points available for Previously Developed properties?

Homes-v4 LTc2:Site selection
posted by  Edward Gulick  on 

The LEEDv4 for Homes Reference Guide is not explicit on whether a previously developed property is eligible for the Infill Development points.  On the one hand, the suggested maximum point tot

0
2
Sustainable Design Leader
HKS, Inc.
LEEDuser Premium Member
40 thumbs up
Fri Apr 12, 2019, 7:13 pm

SRI value (or range) of FDOT #57 stone

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Heidi Carhide  on 

I'm working on a governmental project that uses Florida Dept of Transportation #57 stone as a landscaping material.  The gravel is quarried in south Florida and is limestone rock.  Does a

1
Fri Apr 12, 2019, 4:26 pm

Calculating Conditioned Area

NC-v4 EAp2:Minimum energy performance
posted by  Keith Wallace  on 

Given a building with all conditioned spaces, what is recommended or required to determine the conditioned area square footage?  Do you take measurements from the exterior face of the exterior

1
Fri Apr 12, 2019, 3:11 pm

Water-less Cooling Tower

CS-v4.1 WEc3:Optimize Process Water Use
posted by  John Bello  on 

Our cooling system does not use any water. Instead we are planning to use a R410-a refrigerant. Would this classify for full compliance with Option 2 or Option 3.

0

non-attainment area for PM2.5

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

In Europe which parameters shall be considered to establish whether the site is non-attainment area for PM2.5?

2
Fri Apr 12, 2019, 4:51 am

ID+C CI v4 - Innovation: Purchasing - lamps

EBOM-v4 MRc2:Purchasing - lamps
posted by  Anna McGee  on 

Hello - We're looking into the Innovation credit for low/no mercury lamps for our CI renovation.  The innovation credit has the below notice:

7
Fri Apr 12, 2019, 12:58 am

Construction Waste Recycling Plant distance from Site

CI-v4 MRc6:Construction and demolition waste management
posted by  Ana Mendoza  on 

Hello

We are currently working in a location where there aren't any gypsum recycling plant within a 200 mi radius. We have been looking 

1
Sat Oct 12, 2019, 4:32 pm

Design-Build CxA

CI-v4 EAc1:Enhanced commissioning
posted by  Mark Kohles  on 

In USGBC's "Who can be a Cxa" document (https://www.usgbc.org/resources/who-can-be-cxa), an independent company, not a member

2
Mechanical Designer
Integral Group
LEEDuser Basic Member
13 thumbs up
Thu Apr 11, 2019, 3:30 pm