Current Facilities Requirements and O&M Plan

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Chris Bennett  on 

I am trying to determine if there a specific requirements regarding how the Current Facilities Requirements and O&M Plan is provided.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Thu Mar 28, 2019, 3:02 pm

Updated Modeling Manual?

CI-v4 EAp2:Minimum energy performance
posted by  Deborah Stadler  on 

USGBC has the Advanced Energy Modeling for LEED Technical Manual v2.0 for LEEDv2009, which was helpful.  We cannot find an updated version for v4.  Does anyone know if this exists and whe

1
Wed Mar 27, 2019, 5:01 pm
3
Wed Mar 27, 2019, 2:01 pm

Bicycle racks distance

CS-v4 LTc6:Bicycle facilities
posted by  Guillaume Rose  on 

Hi, 

In my Project, there are 2 bicycle areas : 

- 1 at the same level as the entrance but the distance is more than 30 meters

6
Wed Mar 27, 2019, 1:57 pm

Baseline System Selection

NC-v4 EAp2:Minimum energy performance
posted by  John   on 

I am working on a LEED for Homes project. The project has AHU units, Heat pumps and DOAS. All dwelling units has HPs.

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Wed Mar 27, 2019, 12:54 pm

Requirements only for exterior lighting?

NC-v4 SSc6:Light pollution reduction
posted by  Benjamin Weise  on 

Hello!

Do the requirements for this credit only apply to exterior lighting or does interior lighting need to be considered as well?

Thanks in advance!

7
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Tue Mar 26, 2019, 7:29 pm
3
Tue Mar 26, 2019, 1:56 pm

OPR and BOD

NC-v4 IPc1:Integrative process
posted by  Nolberto Lopez  on 

Hi. I am studying for my LEED Green Associate exam based on LEED V4. Can someone tell me in which site I could get an example of OPR and BOD for rating system NC? Thanks.

8
Mechanical Designer
Integral Group
LEEDuser Basic Member
13 thumbs up
Tue Mar 26, 2019, 10:02 am

Double skin facade

NC-v4 EAp2:Minimum energy performance
posted by  Sarah Leenknegt  on 

Hi

How do I model a naturally ventilated double skin facade in proposed and baseline building?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 26, 2019, 7:21 am

Laminating and Contact Adhesives - Shop Applied - in v4

NC-v4 EQc2:Low emitting materials
posted by  Landry Watson  on 

I've scrolled, searched and reviewed the comments here on the thread and I'm still not clear on whether Laminating/Contact adhesives used for bonding laminates to substrates for shop assembled mill

10
Tue Mar 26, 2019, 12:55 am