Documenting Controller Efficiency
NC-2009 WEc1:Water Efficient Landscapingposted by Michael Hill on
In order to document controller efficiency will it be necessary for the landscape architect to calculate it or would it be acceptable to provide case studies such as those found at http://www.rainb
Legal Wood - Pilot Credit LEEDv4
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Sophie Kerr on
If I have SFI products that make up 100% of my wood products, 25+% of my total materials, and have I completed the survey, have I met the pilot credit?
Tree distance for Tree-lined (v4)
ND-Plan-v4 NPDc14:Tree-lined and shaded streetscapesposted by Nuttanee Vongveeranonchai on
Regarding Ref Guide (p.291) in tree-lined step-by-step guidance, it says the distance between tree truck to the center of the next tree trunk shouldn't exceed than 50 feet (12 met
Interior lighting in dwelling units
CS-2009 EAp2:Minimum Energy Performanceposted by Ashish Nautiyal on
Baseline Example
Pilot-Credits IPpc93:Prevention through Designposted by Logan McNeil on
Our project (UCSF Block 33, SF CA) has found this credit to be worthwhile to pursue, as safety should live in every aspect of a construction project. However, the team noted that it would hav
Sealant for Pipe fittings
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Osama Touni on
hi everyone,
we have pipe fitting sealant and the VOC Content that mentioned in the MSDS is 11% what is this mean ?
Thanks
Heat Island Reduction Roof
EBOM-v4 SSc3:Heat island reductionposted by Nitesh Kumar J on
What if there is a Shed on the Terrace? Since the sun rays are not falling directly on to the terrace and no direct expose of terrace surface... Will such project comply this credit ??
University Housing
Schools-NC-v4 LTc5:Access to quality transitposted by Sean Adams on
We are doing a university housing project and have been basing it off of the BD+C New Construction but for this section if we are able to do it under School-NC we would be able to get the 4 points
Pilot Credit - Forum Participation
Pilot-Credits IPpc101:Integrative Processposted by Greg Romanczyk on
As part of the requirements for this pilot credit, we are noting our participation in the Forum. One of the questions listed asks about the number of meetings (i.e.
System 9 per floor according to ASHRAE 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone,