PROJECTS WITHOUT AVAILABLE RECYCLING INFRASTRUCTURE

NC-v4 MRp1:Storage and collection of recyclables
posted by  Giuseppina Amorusi  on 

Hallo

I have a project  in a site where there are  no available recycling infrastructure.  

4
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Mon Mar 11, 2019, 2:15 pm

Commissioning Documentation for 7 separate towers sharing a common ground floor & podium level with shared/mixed MEP Systems

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Joshua ADY  on 

We are working as an independent commissioning authority (ICA) for a LEED V3 registered project with the following configuration;

1
Sun Aug 11, 2019, 10:23 pm

Pilot v4.1 credit for v2009 NC ID credit

NC-2009 IDc1:Innovation in Design
posted by  Meghan Cole  on 

I have a project registered as v2009 New Construction. They are interested in pursuing the new v4.1 EA Credit: Acoustic Performance as a pilot credit under IDc1.

1
Thu Mar 21, 2019, 10:36 pm
2
Sustainability Consultant
Meehan Green
LEEDuser Basic Member
4 thumbs up
Fri Mar 8, 2019, 6:04 am

Strategies E- Casework?

NC-v4 EQc6:Interior lighting
posted by  LUCY WILLIAMS  on 

Do you have to consider the color/ light reflectance value of the built-in casework within the occupied spaces, under strategy e?  Casework is not technically a wall surface nor is it a work s

2
Principal
Lucy C. Williams, Architect
LEEDuser Basic Member
31 thumbs up
Thu Mar 7, 2019, 10:51 pm

Existing grassland habitat within LEED boundary

NC-2009 WEc1:Water Efficient Landscaping
posted by  Lisa Meniketti  on 

If within our LEED site boundary we have a large portion of existing grassy land areas to remain as they are, as (SS1 and/or SS2) protected habitat, and we do not add irrigation to these grass

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Thu Mar 7, 2019, 9:27 pm

ADC Column in CDWM Calculator

CI-v4 MRc6:Construction and demolition waste management
posted by  Emily English  on 

My question is about the column in the calculator that asks for 

"Commingled Waste: Average Percentage of ADC Produced by the Sorting Facility (%)"

1
Wed Mar 20, 2019, 5:22 am

Sprayed concrete as a temporary stabilization measure

CS-2009 SSp1:Construction Activity Pollution Prevention
posted by  Michael E. Edmonds-Bauer  on 

Our project has around 10 levels of undergrouns parking. A huge ramp for earth-movement vehicles is being created as construction evolves.

3
Thu Mar 7, 2019, 1:32 am
1