Forum quick links
dB & STC
NC-v4 EQc9:Acoustic performanceposted by Helena Garcia on
I'm working with a Spain Project. Spain doesn't use STC Rating, Spain assesses with dB. Can you say me what is the relation between STC and dB? How I can convert the dB into STC? Thank you.
Ceiling Epoxy
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Osama Touni on
Hi Everyone
I have Epoxy for Ceiling, what is the VOC limit & category for it?
Zero Lot line project and Heat Island Reduction
NC-v4 SSc5:Heat island reductionposted by Stephan Zweig on
Hello to all,
I have a zero lot line project, is there a a possibility to go for Option 1 (Roof and Non Roof measures) of Heat Island Reduction Credit?
Split System - for the refrigerant charge calculation
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Hendrick Munoz on
Which part of a Split System should be considered for the refrigerant charge calculation?
Does vegetated roof need to be acessible to the building occupants
CS-v4 SSc3:Open spaceposted by Malin Folkesson on
Does the vegetated roof need to be acessible to building occupants to count towards the 25 % vegetated space?
Regional credit in Argentina
CS-2009 RPc1:Regional Priorityposted by Ines Fischer on
Hello Everyone!
I wanted to know with what percentaje of water savings do I have access to the regional extra credit in Argentina?
Is it 1 credit?
Process energy clarification
NC-v4 EAc2:Optimize energy performanceposted by MAUDE PINTAL on
Hi,
Is heated sidewalk considered as process energy ?
Thank you,
Construction Waste Management Core and Shell and Tenant Upfit Spaces
CS-v4 MRc5:Construction and demolition waste managementposted by Summer Minchew on
Can a Core and Shell project include tenant construction debris in overall CWM calculations? Often tenant construction is concurrent with core and shell construction.
End Energy Use Cost Consumption Air Cooled Vs Water Cooled Chiller
NC-v4 EAp2:Minimum energy performanceposted by Junaid Naseer on
Dear All,
Exclusion of supporting buildings from LEED boundary?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Thomas Tan on
Dear all,