Forum quick links
Vertical Garden
NC-2009 WEc1:Water Efficient Landscapingposted by Charalampos Giannikopoulos on
Please clarify whether a project needs to have vegetated space at a minimum of 5% of the site area. If yes, will vertical gardens count to this area in order to exceed the minimum 5% requirement?
Initial Certification in 2013, Now Recertifying and New Calculator as Part of Template - Our Credit is Static
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Michelle Bracewell-Musson on
Hello,
Buildable Land - public parks and cemetaries?
CS-v4 LTc4:Surrounding density and diverse usesposted by Shannon Oletic on
Are public parks and cemeteries included in buildable land?
Ventilation rates in garages
NC-2009 IEQp1:Minimum IAQ Performanceposted by Maria Porter on
My projects can follow the Ventilation Rate Procedure in ASHRAE 62.1-2007, sections 4 through 7 without bigegr problems.
Preferred Parking - Definition
NC-v4 LTc7:Reduced parking footprintposted by Priya Venkat on
For a group project, with 2 distinct car parking area in site, should we provide preferred parking spaces for each building?
Hotel guests in the calculation tool
Hospitality-NC-v4 WEp2:Indoor water use reductionposted by Maria Porter on
Hi!
Hydrothearpy and treatment areas definition
Healthcare-v4 WEc4:Water meteringposted by Leanne Conrad on
Can anyone confirm what the definition of the above named spaces include?
Engineered wood products
NC-v4 EQc2:Low emitting materialsposted by Christine Richey on
Since engineered wood products (like glulams, I-Joists, and laminated veneer lumber) don't seem to be defined in CARB, are they still considered a composite wood product by LEED v4 in this credit c
Building footprint for open space vs. roof area
Schools-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Yukari Treible on
I haven seen this same type of question in the forum before, but in this particular case it is extreme, so I would appreciate some feedback/opinions.
Selection of HVAC system for baseline building
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi,
for baseline building HVAC selection, we shall follow table G3.1.1A (ASHRAE 90.1-2010), being the system defined depending on the building number of floors and its conditioned area.