Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Vertical Garden

NC-2009 WEc1:Water Efficient Landscaping
posted by  Charalampos Giannikopoulos  on 

Please clarify whether a project needs to have vegetated space at a minimum of 5% of the site area. If yes, will vertical gardens count to this area in order to exceed the minimum 5% requirement?

0

Buildable Land - public parks and cemetaries?

CS-v4 LTc4:Surrounding density and diverse uses
posted by  Shannon Oletic  on 

Are public parks and cemeteries included in buildable land?

1
Mon Feb 4, 2019, 3:01 pm

Ventilation rates in garages

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Maria Porter  on 

My projects can follow the Ventilation Rate Procedure in ASHRAE 62.1-2007, sections 4 through 7 without bigegr problems.

3
Sustainability specialist
Skanska Sweden
LEEDuser Basic Member
205 thumbs up
Fri Feb 1, 2019, 1:43 pm

Preferred Parking - Definition

NC-v4 LTc7:Reduced parking footprint
posted by  Priya Venkat  on 

For a group project, with 2 distinct car parking area in site, should we provide preferred parking spaces for each building?

0
2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu Jan 31, 2019, 8:27 am

Hydrothearpy and treatment areas definition

Healthcare-v4 WEc4:Water metering
posted by  Leanne Conrad  on 

Can anyone confirm what the definition of the above named spaces include?

0

Engineered wood products

NC-v4 EQc2:Low emitting materials
posted by  Christine Richey  on 

Since engineered wood products (like glulams, I-Joists, and laminated veneer lumber) don't seem to be defined in CARB, are they still considered a composite wood product by LEED v4 in this credit c

17
Wed Jan 30, 2019, 3:33 pm

Building footprint for open space vs. roof area

Schools-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Yukari Treible  on 

I haven seen this same type of question in the forum before, but in this particular case it is extreme, so I would appreciate some feedback/opinions.

0

Selection of HVAC system for baseline building

NC-v4 EAp2:Minimum energy performance
posted by  Ricardo Sá  on 

Hi,

for baseline building HVAC selection, we shall follow table G3.1.1A (ASHRAE 90.1-2010), being the system defined depending on the building number of floors and its conditioned area.

1
Wed Jan 30, 2019, 4:45 pm