Forum quick links
When to submit this credit, DR or CR? Documentation of distribution of menstrual hygiene products
Pilot-Credits WEpc147:All-Gender Restroomsposted by Linn Stolt on
Hi!
AEDG Small/Medium Office Buildings - Building or Tenant Sf?
CI-v4 EAc2:Optimize energy performanceposted by RDK E&S on
Hello all,
Pilot vs ACP?
Pilot-Credits EApc95:Alternative Energy Performance Metricposted by on
We have a project pursuing the EApc95 as part of its effort to monitor its carbon footprint.
Utilization of Naturally Ventilated Spaces - Minimum Indoor Air Quality
NC-v4 EQp1:Minimum indoor air quality performanceposted by padma priya on
Which types of projects can utilize naturally ventilated spaces, and how is air quality maintained in polluted areas according to LEED requirements?
Option 2 Documentation
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Kristen Mulligan-Fabian on
For Option 2: Multi-Attribute Optimization, What documentation is needed to show environmental impact reduction?
Extended Producer Responsibility program
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Tracy Marquis on
I am hoping to start a list of manufacturers with Extended Producer Responsibility Programs (EPRs) that meet the LEED V4.1 criteria.
LEED Water Side Calculator for DES1
NC-v4 EAp2:Minimum energy performanceposted by elvin ruya on
Hi,
Maps from the Stone Age Don't Exist?
NC-v4 SSc4:Rainwater managementposted by Hannah Fleck on
I am trying to track down historical information to meet the compliance for the pre-development pathway but am coming up short for finding land cover and contour maps predevelopment.
Energy modeling for Half a Floor
CI-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
So we are facing a new Commercial Interior project that only takes up approximately half of a floor. The problem we are facing is if we can conduct an energy model for half of floor. Th
Standard for the baseline of the cold storage in a factory
NC-v4.1 EAp2:Minimum Energy Performanceposted by Michael on
My factory project has cold storage (10oC) and a freezer (-13oC).