Forum quick links
Existing Building as LCA Baseline
NC-v4 MRc1:Building life-cycle impact reductionposted by Kristen DiStefano on
One of the four options for creating LCA baselines according to this LEED Interpretation - https://www.usgbc.org/content/100002019 - is to use an existing building, and make modifications necessary
Subtraction metering in C&S
CS-v4 EAc3:Advanced energy meteringposted by HoMU WELLTECH on
Good morning,
Double counting Material Ingredients reporting
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Vandita Mudgal on
I think I know the answer, but worth checking with the group.
Residuals Disclosure in HPDv1: "Other" option
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Kena David on
An HPDv1 that we would like to count for credit has "Other" marked under "Residuals Disclosure." Is there any precedent for this counting the HPD for credit?
PI Form 2 Estimated project budget
NC-2009 PIf2:Project Summary Detailsposted by Brian Durgin on
Our project consist of multiple buildings on a large site, well our LEED Boundary only includes the main building and surrounding site area.
Ozone treatment
NC-v4 EQp1:Minimum indoor air quality performanceposted by Gabriela Crespo on
Dear all, We are working on a project where the ozone levels exceed the most recent three year average, so we must include air-cleaning devices for ozone.
Factory-Existing Building
EBOM-v4 EAp2:Minimum energy performanceposted by VISHESH AGARWAL on
I am working on the factory existing building project. the machine load is about 3000 kw.
Clarify the requirement for offsite coatings (and/or coating that will be covered)
NC-v4 EQc2:Low emitting materialsposted by Summer Gorder on
The team as me to clarify the definition of Primers, Sealers, and Undercoaters in the LEED description? Does that include any coating that gets covered with an addi
Project in Europe
NC-v4 EQc5:Thermal comfortposted by Konstantina Kalliakoudi on
Hello to all,
For Projects that are outside USA, in my case in Europe can I comply with Option 1? Also comply ASHRAE 55-2010?
Or is it necessary to comply with Option 2?
Condensate to a campus grey water system instead of being used on-site
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Bo White on
Our building is on a college campus and we plan to route all condensate to the campus grey water system. Does this qualify even though it is not being used on-site?