Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Project Boundary - Excluding ceiling work for HVAC and plumbing connections

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Tracy Marquis  on 

We are renovating spaces on the ground floor of an academic building.  The primary renovation spaces are contiguous, however, there will be minor work in the ceilings, outside of the LEED boun

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed Jan 9, 2019, 4:46 pm

Which building type does data centre belong?

CI-v4 LTc5:Reduced parking footprint
posted by  Ameet AA  on 

There's no such a building type as data centre in the base ratio table, I was wondering if it should be "data processing, telemarketing", or "general light industrial, industrial park, and manufact

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Wed Jan 9, 2019, 1:10 am
2
Tue Jan 8, 2019, 9:44 pm
1
Fri Dec 20, 2019, 6:03 pm

IEQc4.1 VOC content questions

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Christopher Baker  on 

I am preparing responses to a LEED review but have a couple questions on how to approach the VOC Content reporting for credit form IEQC4.1. The LEED online forms will allow me to enter VOC of 50 g

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Tue Jan 8, 2019, 7:41 pm

Changes in the LEED v4.1 BD+C draft to the Option 4 WBLCA - positive, overall

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Panu Pasanen  on 

As most will have noted, the language for the v4.1 BD+C draft came out just before holidays.

0

Green electricity

CS-v4 EAc7:Green power and carbon offsets
posted by  Guillaume Rose  on 

Hi, 

I work on a 100% electric project.

1
Tue Jan 8, 2019, 3:58 pm

Proof on Exceptional Calculations of Energy Modelling

CS-2009 EAp2:Minimum Energy Performance
posted by  Kathy Wong  on 

Our LEED project has adopted lighting control as energy-saving strategy for parking garage and documented as exceptional calculation in EAp2 and EAc1.

4
Tue Jan 8, 2019, 9:48 am

1 big LEED project or a group of a dozen little ones?

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Susan Di Giulio  on 

So let's say you have a big, multilevel car rental facility. The vast majority of the building is unconditioned car storage. Not parking. Rental car storage.

1
Tue Jan 8, 2019, 12:21 pm