Option 2: Parking under cover
NC-v4 SSc5:Heat island reductionposted by Konstantina Kalliakoudi on
Hello to all,
This credit requires the 75% of parking spaces under cover.
1. So this percents refers to parking spaces and not to parking area (m2/ft2), right?
Clarification on Option 01 50% Saving - WEc1 - Water Efficient Landscaping
NC-2009 WEc1:Water Efficient Landscapingposted by SAMY Chamy on
Dear all :-
we are working in a project with 100% non potable water (On site recycling water 0 using for both Flushing fixture and Irrigation)
adhesive for sheet vinyl
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Deborah Lucking on
We have a project that requires sheet vinyl flooring that is "static dissipative and static conductive". The conductive adhesive has 56 g/L VOC.
theatre/music/ event room in hotel project
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Natalia Kwiecinska on
Hi everyone,
I am documenting a hotel project. One issue is not obvious for me, so maybe someone can help.
Main Street Program as a Priority Designation
NC-v4 LTc3:High priority siteposted by Teresa Stern on
Our project is located 2 blocks from the nearest historic district, but is within the Downtown area encompassed by the local Main Street Program.
Distance to main entrance from long term storage of bikes
NC-v4 LTc6:Bicycle facilitiesposted by akshaya bhaskar on
Hi,
shower location in adjacent building
NC-v4 LTc6:Bicycle facilitiesposted by akshaya bhaskar on
Hello,
LEED Project Boundary on Contract Documents
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Mark Zoeteman on
Is it required in v4 BD+C to show LPB on civil and architectural contract documents? Project includes renovation and addition to an existing building.
Enhanced Cx Option 2 Envelope Commissioning Requirements
NC-v4 EAc1:Enhanced commissioningposted by Krystina Kattermann on
Hi folks,
LCA Boundary Condition
NC-v4 MRc1:Building life-cycle impact reductionposted by Thanyatorn Khumpairoj on
I have questions about the whole building life cycle assessment (LCA). Why baseline is so open? According to ASHRAE 90.1, Do we use only for U-value of the envelope?