Option 2: Parking under cover

NC-v4 SSc5:Heat island reduction
posted by  Konstantina Kalliakoudi  on 

Hello to all,

This credit requires the 75% of parking spaces under cover.

1. So this percents refers to parking spaces and not to parking area (m2/ft2), right?  

2
Sustainability Program Manager
Primus Design Services, LLC
LEEDuser Premium Member
40 thumbs up
Thu Dec 6, 2018, 12:06 pm

Clarification on Option 01 50% Saving - WEc1 - Water Efficient Landscaping

NC-2009 WEc1:Water Efficient Landscaping
posted by  SAMY Chamy  on 

Dear all :- 

 

 we are working in a project with 100% non potable water (On site recycling water 0 using for both Flushing fixture and Irrigation)

1
Fri Dec 7, 2018, 4:28 am

adhesive for sheet vinyl

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Deborah Lucking  on 

We have a project that requires sheet vinyl flooring that is "static dissipative and static conductive". The conductive adhesive has 56 g/L VOC.

3
Principal
Sage Design & Consulting
LEEDuser Basic Member
55 thumbs up
Wed Dec 5, 2018, 8:54 pm

theatre/music/ event room in hotel project

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Natalia Kwiecinska  on 

Hi everyone,

I am documenting a hotel project. One issue is not obvious for me, so maybe someone can help.

1
Thu Dec 6, 2018, 3:33 pm

Main Street Program as a Priority Designation

NC-v4 LTc3:High priority site
posted by  Teresa Stern  on 

Our project is located 2 blocks from the nearest historic district, but is within the Downtown area encompassed by the local Main Street Program.

2
Sustainability Program Manager
Primus Design Services, LLC
LEEDuser Premium Member
40 thumbs up
Wed Dec 5, 2018, 2:58 pm

LEED Project Boundary on Contract Documents

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Mark Zoeteman  on 

Is it required in v4 BD+C to show LPB on civil and architectural contract documents? Project includes renovation and addition to an existing building.

0

LCA Boundary Condition

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Thanyatorn Khumpairoj  on 

I have questions about the whole building life cycle assessment (LCA). Why baseline is so open? According to ASHRAE 90.1, Do we use only for U-value of the envelope?

2
Tue Dec 4, 2018, 7:02 am