Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Project Boundary (Urban Environment) - Bike racks on sidewalk

CS-v4 LTc6:Bicycle facilities
posted by  Matthew Wang  on 

I have a commercial office building in Manhattan with retail on the ground floor.  The public sidewalk is excluded from the Project Boundary because it is outside of my property line and a pub

1
Thu Nov 15, 2018, 4:56 am

Contact local utility representatives to discuss participation in future DR programs

NC-v4 EAc4:Demand response
posted by  DAVE LI  on 

The local utility company did not provide a demand response plan.

3
Default Avatar
Delta Electronics
LEEDuser Basic Member
1 thumbs up
Wed Nov 14, 2018, 3:24 pm

Option 2 - threshold of 30% of the costs attributed Structure and Enclosure

CS-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Barry Farren  on 

For Option 2, demonstrating that 25% of the cost of the project materials meet REACh compliance, There is a requirement that only 30% of these material costs can be attributed t

0

Mulitzone FCU with VAV

CI-v4 EQp1:Minimum indoor air quality performance
posted by  Gopinath Vasu  on 
Hi All, I am working in a project where FCUs (cooling only) system with VAVs are used to condition the group of spaces. The fresh air supply to the space is from TFA system.
0

NEW Non FSC Certified Wood used as Redwood Header installed under the ground outside the building

NC-2009 MRc7:Certified Wood
posted by  Benjie Herrera  on 

Is the NEW Non FSC Wood  Header installed underground outside the building not part of the NEW Wood Baseline in MRC7 Certified Wood?

 

Please advise.

1
Thu Nov 15, 2018, 5:00 am

Airflow Monitoring with DCV

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Nancy Henderson  on 

Hello, we have several projects that are using single zone RTU's with CO2 based demand control ventilation.  We have already established through conversations with a LEED Coach that the units

1
Tue Dec 4, 2018, 6:57 pm

LEED 2009 Submission deadline

NC-2009 PIf1:Minimum Program Requirements
posted by  Amy Harmon  on 

Is there a deadline for projects that have been registered as 2009?  Can these projects use the 2.3 templates or do they need to be submitted using version 4 templates?

1
Thu Nov 15, 2018, 4:58 am