Roll-out mats details

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Summer   on 

Anyone can confirm if all roll-out mats should be provided with zocallo to insert the carpet?

1
Fri Nov 9, 2018, 3:41 pm

Animal Research Facility with attached gates

EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additions
posted by  Amy Burns  on 

We are a higher education campus and are Facility Alteration that had attached gates that were used for the animal research but are not needed now.

2
Founder & Senior Consultant
Viable LLC
LEEDuser Premium Member
12 thumbs up
Thu Nov 8, 2018, 11:44 pm

VOC budget process in this credit

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Albert Sagrera  on 

Can I use the same "VOC budget process" to justify this credit as in credit 4.2 if I make a misatke or If I have just one product that is used minimally on a project?. Thanks

5
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Thu Nov 8, 2018, 11:28 pm

Certification required to perform pressure differential test?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Vanessa Nelson  on 

Is a certification required to perform the pressure differential test? I'm wondering if it needs to be done by a specialty testing company or can it be done by the Mechanical Sub?

1
Thu Nov 8, 2018, 11:30 pm

Single Phase UPS

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Omar Delgado  on 

Greetings all, I have a CI project that has single phase UPS, PoE Switches, and some AiroNet AP. Are all these excluded from the calculation? Thanks!

3
Sustainability Account Manager
Stok
LEEDuser Expert
177 thumbs up
Thu Nov 8, 2018, 7:58 pm

calculating rated power and bigger questions

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Michele Helou  on 

I cannot get the nameplate power from an Energy Star residential refrigerator used for a commercial project. I called the manufacturer, checked the manuals, etc. no luck.

5
Thu Nov 8, 2018, 7:57 pm

More on UPS s

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Susan Di Giulio  on 

Hi, I understand all the previous discussion UPSs but our situation is just a tad different, The project in question is intensely tech related, and the UPS needed as backup is a 3 phase, 50,000 kV

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 8, 2018, 7:56 pm

No-break (UPS - UPS - Uninterruptible Power Supplies)

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Vitorio Lepiane  on 

I am trying to determine if we need to include " No-break (UPS - Uninterruptible Power Supplies) " in our Energy Star documentation for this credit.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 8, 2018, 7:55 pm

UPS - Excluded or Included in Energy Star calculation

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Graeme Smith  on 

I have two questions regarding the inclusion of UPS in the 'Energy Star' calculation for EAc1.4 in LEED v2009. Q1.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 8, 2018, 7:55 pm