Roll-out mats details
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Summer on
Anyone can confirm if all roll-out mats should be provided with zocallo to insert the carpet?
Roll-out mats for entrance only and exit not included
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Summer on
Hello everyone,
Animal Research Facility with attached gates
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Amy Burns on
We are a higher education campus and are Facility Alteration that had attached gates that were used for the animal research but are not needed now.
VOC budget process in this credit
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Albert Sagrera on
Can I use the same "VOC budget process" to justify this credit as in credit 4.2 if I make a misatke or If I have just one product that is used minimally on a project?. Thanks
Certification required to perform pressure differential test?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Vanessa Nelson on
Is a certification required to perform the pressure differential test? I'm wondering if it needs to be done by a specialty testing company or can it be done by the Mechanical Sub?
Single Phase UPS
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Omar Delgado on
Greetings all, I have a CI project that has single phase UPS, PoE Switches, and some AiroNet AP. Are all these excluded from the calculation? Thanks!
calculating rated power and bigger questions
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Michele Helou on
I cannot get the nameplate power from an Energy Star residential refrigerator used for a commercial project. I called the manufacturer, checked the manuals, etc. no luck.
More on UPS s
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Susan Di Giulio on
Hi, I understand all the previous discussion UPSs but our situation is just a tad different, The project in question is intensely tech related, and the UPS needed as backup is a 3 phase, 50,000 kV
No-break (UPS - UPS - Uninterruptible Power Supplies)
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Vitorio Lepiane on
I am trying to determine if we need to include " No-break (UPS - Uninterruptible Power Supplies) " in our Energy Star documentation for this credit.
UPS - Excluded or Included in Energy Star calculation
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Graeme Smith on
I have two questions regarding the inclusion of UPS in the 'Energy Star' calculation for EAc1.4 in LEED v2009. Q1.