Forum quick links
Fresh air in Tenant Lease Agreement
CS-v4 EQp1:Minimum indoor air quality performanceposted by Nandana Kumar on
Hi,
CxA firm or an individual
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Omar Elrawy on
Dear All,
I need to know if the CxA can be an individual experienced person, or it must be a Cx firm (office)?
Food production in a Business District?
ND-Plan-v4 NPDc13:Local food productionposted by Sareet Benayahu on
Hi. our LEED ND Plan project is for a business and retail sector, with congress halls and hotels. no residential units are planned.
Eligibility for LEED V4 fundamental Cx
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by INES DAHMOUNI on
Hello everyone, we are looking a CxA for a LEED project . We contacted an office specialized in energy and environmental studies.
existing trees to remain, but not greenfield
NC-v4 SSc2:Site development - protect or restore habitatposted by emily reese moody on
Our project is building adjacent to an existing building, and will connect to it via a pedestrian bridge. Between the two buildings are several existing, older trees that are required to remain.
Differences between design phase and construction phase
NC-v4 MPR3:Must comply with project size requirementsposted by JORDI CASTELLANO on
hello everyone,
our project has achieved the design phase of LEED review.
District pumping energy consumption
ND-v2009 GIBc12:District heating and coolingposted by Vincent Dupuy on
Hello,
Kitchen faucet nominal flow rate vs maximum flow rate
CI-v4 WEp1:Indoor water use reductionposted by shashank gangil on
We are doing a CI project in Hong Kong and going to select a kitchen faucet for installation in the pantry.
Optimize energy on Datacenter equipments
NC-v4 EAc2:Optimize energy performanceposted by Amine Zeidane on
Hello,
thinner use for cleaning purposes
CS-v4 EQc2:Low emitting materialsposted by monica castro urbina on
The construction team want to know if the thinner used to clean the formwork for concrete slabs in the post-tensionnnig method have to comply with the VOC's limit required in the SCAQMD rule 1143?