Concrete form work coatings?

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Erin Holdenried  on 

Would form work coatings fall into this LEED credit? What would their VOC limit be? Thanks!

7
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Thu Oct 4, 2018, 10:27 am
1
Thu Oct 4, 2018, 2:27 pm

Lavatory durations - justified deviation from "default" 30 sec?

NC-v4 WEc2:Indoor water use reduction
posted by  Joanna Switzer  on 

Hi all, In LEED 2009/v3 the assumption for metered/sensor cycled duration in public lavatories was 12 seconds, per USGBC issued WEp1 "additional guidance" & the excel calculator notes.

10
Design Engineer
MacDonald-Miller
LEEDuser Basic Member
1 thumbs up
Wed Oct 3, 2018, 11:45 pm

NAUF in Low Emitting Calculator for Comp Wood

NC-v4 EQc2:Low emitting materials
posted by  Michelle Rosenberger  on 

Given all the discussion and confusion about composite wood certification issues, why does the version 3 Low Emitting Materials Calculator include NAUF in the pull down for compliant composite wood

20
Marketing Communications
Roseburg Forest Products
LEEDuser Premium Member
14 thumbs up
Wed Oct 3, 2018, 3:29 pm

Site Assessment

Data-Centers-NC-v4 SSc1:Site assessment
posted by  David Edenburn  on 

V4 NC says that a site assessment is a pre-requisite, but then underneath it says for "schools and healthcare". Does this mean is it not a pre-requisite for other types of buildings?

0

Bike Network Diverse Use Restrictions

Schools-NC-v4 LTc6:Bicycle facilities
posted by  Max Krueger  on 

Hi,

 

Do the same diverse use restrictions found in LT Surrounding Density and Diverse Uses apply to the diverse uses that need to connect to the bicycle network?

0

Verified Construction & Demo Recycling Rates - Project vs. Facility

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Amanda Atkinson  on 

"Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials to the facility."

1