Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Water sense substitutes

NC-v4 WEp2:Indoor water use reduction
posted by  soha yamani  on 

in the addenda table dated 12-10-2016 , it is stated that Replace "Projects in unlisted countries must comply with the 20%-below-baseline requirement but have no additional performance requirements

2
Default Avatar
Senior Architect
Dubai
LEEDuser Basic Member
0 thumbs up
Mon Oct 1, 2018, 9:32 am

Monitoring of Outdoor Air flow

CI-v4 EQp1:Minimum indoor air quality performance
posted by  Katarzyna Toczynska  on 

LEED reference guide CI v4 says to monitor outdoor air intake flow.

2
Mon Oct 1, 2018, 7:28 am

Structure and Enclosure

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Jon Clifford  on 

A discussion on the BPDO-EPD forum (http://www.leeduser.com/comment/redirect/66396) has started me thinking about how to treat materials that could fall on a Credit tipping point depending on wheth

5
President
C-Wise Design and Consulting
LEEDuser Premium Member
70 thumbs up
Mon Oct 1, 2018, 1:28 am

Campus cooling towers

CS-v4 WEc3:Cooling tower water use
posted by  Ted Kussow  on 

The building being designed is to be connected to a campus cooling system with cooling towers.  Can we get this credit if the campus cooling towers meet the requirements?

1
Fri Jan 18, 2019, 7:11 am

Cleaning Equipment compliance with IEQC3.1

EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Program
posted by  Jubilee Daniels, MLA, LEED AP O+M  on 

I have a building that is pursuing recertification under LEED EBOM V2009. They achieved IEQC3.4 Green Cleaning - Sustainable Cleaning Equipment in their previous certification.

2
Fri Sep 28, 2018, 5:27 pm
2
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Fri Sep 28, 2018, 4:50 pm

Large Developed Sites

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Priya Venkat  on 

The project has large site area. The distance between site entrance and bus stop is within 400 m.

0

Shuttle between building and secured site entrances

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  J Douglas Dietrich  on 

Distance from LEED building to public transit stops is too far to meet requirements, however distance from the guardhouse gate controlling access to the secured site on which the LEED building is l

4
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Fri Sep 28, 2018, 10:48 am

Building entrance vs site entrance

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Alicia Freire  on 

Hi, I am working on a development located in the centre of a large site.

6
LEED AP ID+C & BD+C
Ecoteric Ltd
LEEDuser Premium Member
1 thumbs up
Fri Sep 28, 2018, 9:51 am