Forum quick links
Water sense substitutes
NC-v4 WEp2:Indoor water use reductionposted by soha yamani on
in the addenda table dated 12-10-2016 , it is stated that Replace "Projects in unlisted countries must comply with the 20%-below-baseline requirement but have no additional performance requirements
Monitoring of Outdoor Air flow
CI-v4 EQp1:Minimum indoor air quality performanceposted by Katarzyna Toczynska on
LEED reference guide CI v4 says to monitor outdoor air intake flow.
Structure and Enclosure
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jon Clifford on
A discussion on the BPDO-EPD forum (http://www.leeduser.com/comment/redirect/66396) has started me thinking about how to treat materials that could fall on a Credit tipping point depending on wheth
Campus cooling towers
CS-v4 WEc3:Cooling tower water useposted by Ted Kussow on
The building being designed is to be connected to a campus cooling system with cooling towers. Can we get this credit if the campus cooling towers meet the requirements?
Cleaning Equipment compliance with IEQC3.1
EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Programposted by Jubilee Daniels, MLA, LEED AP O+M on
I have a building that is pursuing recertification under LEED EBOM V2009. They achieved IEQC3.4 Green Cleaning - Sustainable Cleaning Equipment in their previous certification.
Energy cost for Baseline and proposed case CHP system
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All
Large Developed Sites
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Priya Venkat on
The project has large site area. The distance between site entrance and bus stop is within 400 m.
Shuttle between building and secured site entrances
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by J Douglas Dietrich on
Distance from LEED building to public transit stops is too far to meet requirements, however distance from the guardhouse gate controlling access to the secured site on which the LEED building is l
Building entrance vs site entrance
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Alicia Freire on
Hi, I am working on a development located in the centre of a large site.