EAp2 Option 2 - 50% watts in Energy Star no longer required?
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Gail Napell on
we're doing a hotel. Owner's preferred guestroom mini-frig is NOT Energy Star compliant (as you know, many appliances that used to be Energy Star no longer are under new requirements).
Reusing existing concrete slabs
NC-2009 MRc3:Materials Reuseposted by Laura Rebbe on
We are maintaining an existing aircraft hangar floor slab and an adjacent concrete apron for reuse as an equipment parking area.
Air/water-resistive barrier VOC requirement
Schools-NC-v4 EQc2:Low emitting materialsposted by Coral Pais on
Is a fluid-applied air/water-resistive barrier considered a "waterproofing material" which must meet VOC requirements for exterior-applied products?
LEED User Concrete Tracking Form
NC-2009 MRc4:Recycled Contentposted by Melanie Blacklock on
Trying to use the LEED User Concrete Tracking Form for the first time to track fly ash. My question concerns Item I: Distances from both harvesting AND manufacturing point to project site (miles).
How to calculated for hybrid urinals
CI-2009 WEc1:Water Use Reductionposted by Susan Di Giulio on
Sloan has a new "hybrid" urinal that is basically waterless but does a pre-programmed, 1 gallon system flush every 72 hours. This solves a lot of maintenance and odor problems.
What if the project JUST uses only 1ea for each 20 EPD materials?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by J.W. Shin on
Hi,
What if the project JUST uses only 1ea for each 20 EPD materials?
Ready Mix Concrete
CS-2009 MRc5:Regional Materialsposted by Ann E on
Hi,
Regarding the mentioned subject, is there/ what papers/certification is needed to submit by the RMC Supplier regarding LEED?
Thank you.
Finding an auditor
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Joanne Sawatzky on
Hi,
Do any of you have a recommendation on where to find a 3rd-party APPA auditor? This is for a project in BC, Canada. Thanks in advance!
SJ
Vertical Expansion v. Horizontal Expansion
Healthcare-v4 MRc8:Design for flexibilityposted by Mary Couch on
Hello! I'm working on a project and we can only achieve Modular/Movable Casework, Vertical Expansion and Horizontal Expansion.
Shower for Large Unbuilt Out Retail in Mixed Use
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Michelle Rosenberger on
If we have a high rise residential tower with a large amount of retail/restaurant space that will be built out by future tenants, is there a way to address the shower requirement without putting it