CI-2009 PIf4:Schedule and Overview Documents
posted by  Hana Altabbaa  on 

What are the consequences of re-opening an approved credit from early Design submittal to re-edit information for ex. update the project boundaries for the final design submittal ?

1
Thu Sep 13, 2018, 9:14 pm

Commercial Toilets

CS-v4 WEp2:Indoor water use reduction
posted by  Michelle Rosenberger  on 

There is a very specific comment that eligible toilet fixtures only include tank style fixtures. Yet I see commercial style flush valve fixtures on the EPA WaterSense website.

3
Thu Sep 13, 2018, 6:07 pm

Heat Island Reduction: Parking under Cover

Healthcare-v4 SSc5:Heat island reduction
posted by  Mary Couch  on 

I am on a project currently where we are pursuing option one of the Heat Island credit, we are curious as to whether we are able to pursue option B as well.

1
Fri Oct 19, 2018, 1:50 am

Exemption for Protected Buildings

CS-v4 EQp1:Minimum indoor air quality performance
posted by  Ciaran McCabe  on 

Hi, Is there any exemptions from the ASHRAE 62.1 for buildings that are protected by local authorities. For example such buildings are protected because they are of architectural interest.

3
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Wed Sep 12, 2018, 7:32 pm

Off site renewable eenergy EAc2

NC-2009 EAc2:On-Site Renewable Energy
posted by  Richardson Jean-Baptiste  on 

Hello! I have a project ( a new Science building on a college campus) under NC-2009.

1
Wed Sep 12, 2018, 7:50 pm

Outdoor air calculator for Healthcare facilities

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Gabriela Mena   on 

Hi, 

 

We are working in a Healthcare facilities project. How can we document compliance with the minimum Outdoor Air Changes required by ASHRAE 170-2008 Table 7-1?

0

Compliance with AgBB/DIBt method

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  PAWAN DAHIWAL  on 

We have received Eurofin Test Certificate providing TVOC concentration after 3 days and 28 days as per AgBB scheme - DIBt guidelines.

0

Preserved for the life of the building?

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Erin Holdenried  on 

Does restored area have to be preserved for the life of the building, as v2009?  It appears this is no longer a requirements in v4. Can any one confirm?

0

Preserved for the llife of the building?

NC-v4 SSc3:Open space
posted by  Erin Holdenried  on 

Does Open Space have to be preserved for the life of the building?  This previous v2009 requirement seems to have been removed from v4.  Can anyone confirm? Thanks

0