Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Rice-Field as Previously Developed Land

Warehouses-NC-v4 LTc2:Sensitive land protection
posted by  Dick Bernadi  on 

Does rice-fields also categorized as "previously developed land"?

1
Thu Aug 30, 2018, 7:43 pm

Fan demand from Performance Outputs tab exceeds fan power from Air-Side HVAC tab

NC-v4 EAp2:Minimum energy performance
posted by  Edgar Arevalo  on 

I have received this question generated by the LEED v4 Minimum Energy Performance calculator stating "The fan demand (as reported in the Performance Outputs tab) for the baseline and/or proposed ex

5
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Thu Aug 30, 2018, 1:26 am

VOC budget calculation success for partially compliant category?

NC-v4 EQc2:Low emitting materials
posted by  Joanna Switzer  on 

Hi all, Despite following the instructions tab details, I have been encountering Low-emitting spreadsheet/calculator errors when attempting to generate assembly calculations to overcome several (g

3
Sustainability Project Manager
Atkins
LEEDuser Basic Member
59 thumbs up
Wed Aug 29, 2018, 7:19 pm

Duct-mounted CO2 monitors

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Edgar Arevalo  on 

The design for a current building involves installing CO2 sensors in the return duct of each densely occupied space rather than inside of the space itself.  Since the LEED v4 BD+C handboo

3
Wed Aug 29, 2018, 5:34 pm

Fire-retarding Putty

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Sherif Ramzy  on 

Dears, I would really appreciate your kind help. 

3
Sustainability Professional
Shaker Consultancy Group
LEEDuser Basic Member
0 thumbs up
Wed Aug 29, 2018, 5:04 pm

LEED Indoor water use calculator

NC-v4 WEc2:Indoor water use reduction
posted by  Jason Garvens  on 

If a project is using reclaimed greywayter and rainwater stored in a cistern to flush toilets in a building how would one properly account for that on the LEED Indoor water use reduction calculator

3
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Aug 29, 2018, 1:29 pm

Formaldehyde levels too high in ONE room

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Jenni Betancourt  on 

For a current higher education project, they performed the Air Testing and it shows everything in compliance except for one room showed a level out of compliance for Formaldehyde.

2
Default Avatar
Industrial Hygienist
Aria Environmental, Inc.
LEEDuser Basic Member
1 thumbs up
Wed Aug 29, 2018, 3:18 am
6
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Tue Aug 28, 2018, 11:52 pm