Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Does Electric Cables with EPD can count as one product for this credit?

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  CHANTAL CARIUS  on 

We are helping to achieve Platinum certification for one building in Mexico City. There is a lack of EPD's in our country so we are trying very hard to get at least one point of this credit.

0

Montioring Plan - Submission

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Johanna Scogin  on 

Once the 3 year period is up, what happens to the documentation the occupants fill out about the bird collision? Do they get uploaded to the USGBC?
 

1
Thu Nov 29, 2018, 5:27 pm

Buying REC for Hong Kong Project

CI-v4 EAc6:Green power and carbon offsets
posted by  shashank gangil  on 

We are doing a Hong Kong based Commercial Interior Project. We have suggested our client to go for RECs.

1
Thu Aug 16, 2018, 3:07 pm
1
Thu Aug 16, 2018, 1:22 pm

Visible Light Transmittance

NC-v4 EQc8:Quality views
posted by  Max Krueger  on 

Will specing a low (40%>) VLT  in vision glazing as a glare control measure affect this credit?

Thanks.

5
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Wed Aug 15, 2018, 5:14 pm

v4 DES baseline system modeling for multiple buildings under LEED campus

NC-v4 EAp2:Minimum energy performance
posted by  X. Chen  on 

We are trying to submit to LEED v4 for a site with multiple buildings using LEED campus path. The whole campus is served by central chiller and boiler plant.

3
Wed Aug 15, 2018, 2:22 pm

Nursing Home Bicycles

NC-v4 LTc6:Bicycle facilities
posted by  Maria Porter  on 

I’m reading through old threads below, but can’t find my answers:

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Wed Aug 15, 2018, 7:04 am

Expiration of Emission Testing Certificates

CI-v4 EQc4:Indoor air quality assessment
posted by  Maria Fiorelli  on 

Is it acceptable to upload certificates backing up emissions testing (i.e.

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Tue Aug 14, 2018, 8:49 pm

Walk-off Mat Needed at Service or Loading Dock Entries?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Harry Flamm  on 

Is it required by your experience with LEED v4, that a building's back-of-house Service Entry or Loading Dock Entry to the building be outfitted with a walk-off mat?  A LEED reviewer may

1
Thu Aug 23, 2018, 8:58 pm