Forum quick links
Does Electric Cables with EPD can count as one product for this credit?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by CHANTAL CARIUS on
We are helping to achieve Platinum certification for one building in Mexico City. There is a lack of EPD's in our country so we are trying very hard to get at least one point of this credit.
Montioring Plan - Submission
Pilot-Credits SSpc55:Bird collision deterrenceposted by Johanna Scogin on
Once the 3 year period is up, what happens to the documentation the occupants fill out about the bird collision? Do they get uploaded to the USGBC?
Buying REC for Hong Kong Project
CI-v4 EAc6:Green power and carbon offsetsposted by shashank gangil on
We are doing a Hong Kong based Commercial Interior Project. We have suggested our client to go for RECs.
Visible Light Transmittance
NC-v4 EQc8:Quality viewsposted by Max Krueger on
Will specing a low (40%>) VLT in vision glazing as a glare control measure affect this credit?
Thanks.
v4 DES baseline system modeling for multiple buildings under LEED campus
NC-v4 EAp2:Minimum energy performanceposted by X. Chen on
We are trying to submit to LEED v4 for a site with multiple buildings using LEED campus path. The whole campus is served by central chiller and boiler plant.
Nursing Home Bicycles
NC-v4 LTc6:Bicycle facilitiesposted by Maria Porter on
I’m reading through old threads below, but can’t find my answers:
Minimum Efficiency Requirements for combined split type unit
NC-2009 EAp2:Minimum Energy Performanceposted by sompoche sirichote on
Hi LEED Expert,
Expiration of Emission Testing Certificates
CI-v4 EQc4:Indoor air quality assessmentposted by Maria Fiorelli on
Is it acceptable to upload certificates backing up emissions testing (i.e.
Walk-off Mat Needed at Service or Loading Dock Entries?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Harry Flamm on
Is it required by your experience with LEED v4, that a building's back-of-house Service Entry or Loading Dock Entry to the building be outfitted with a walk-off mat? A LEED reviewer may